Laserfiche WebLink
r <br /> The exchange of 1.8 acres appears to meet this requirement. <br /> (4) Aftcr the lot ',Inc aUi <br /> "usti-ient,the parcels of land subject to contract will be large enough <br /> to sustain their agricultural use,as defined in Section 51222. <br /> The Lot Line Adjustment appears to meet this requirement. Both before and after the lot line <br /> adjustment,the northern properties are almost entirely either Prime Farmland or Farmland of <br /> Statewide Importance according to the San Joaquin County Important Farmland 2002 map. <br /> Generally,the lots meet this requirement if they are over 10 gross acres in size. <br /> (5) The lot line adjustment would not compromise the long-term agricultural productivity of <br /> the parcel or the agricultural lands subject to a contract or contracts. <br /> The lot line adjustment appears to meet this requirement. <br /> (6) The lot line adjustment is not likely to remove adjacent land from agricultural use. <br /> The proposed lot line adjustment does not appear to meet this requirement, as the purpose of <br /> the lot line adjustment is to facilitate the conversion of 51 acres from agricultural use to <br /> residential use. <br /> (7) The lot line adjustment does not result in a greater number of developable parcels than <br /> existed prior to the adjustment, or an adjusted lot that is inconsistent with the general <br /> plan. <br /> The lot line adjustment appears to be consistent with this requirement. <br /> MAJOR SUBDIVISION <br /> If the General Plan Amendment and Zone Reclassification are approved without public sewer and <br /> without conditions,the following minimum requirements would apply to the underlying Major <br /> Subdivision application: <br /> Development Requirements <br /> In non-agricultural zones, septic systems will only be considered for parcels two(2)acres or more <br /> in size, except in areas zoned Rural Residential,where parcels one(1)acre or more in size will be <br /> considered if served by a public water system and public storm drainage system (Development <br /> Title Section 9-1105.2[d][6]). <br /> The underlying project includes parcels less than two acres in size to be served by on site septic <br /> systems. Therefore, a public water system and a public storm drainage system will be required. <br /> The Morada North County Service Area(CSA 46)provides public water and storm drainage for a <br /> portion of the Morada urban community located directly west of the railroad tracks. Where an <br /> agency exists to provide public water and storm drainage in a community, required public water <br /> and storm drainage systems shall be provided by an existing public agency(Development Title <br /> Sections 9-1120.3 and 9-1135.3). <br /> Resource Conservation <br /> Mosher Creek,which transects the southeast corner of the site, has a General Plan designation of <br /> OS/RC (Resource Conservation). The following General Plan Implementation Measures apply: <br />