Laserfiche WebLink
' Pq-04-253 � -- <br /> Page 2 of 2 (GP)Pre APpliccktbn <br /> C. Connection to `-- <br /> an approved public <br /> 1120.2 <br /> Section 9- water supply system <br /> DeVelopment Tis required '^ <br /> • Test well �'��Joaquin County <br /> will be required to meet the following: <br /> 1• Water g• <br /> 2 Water quant tested to meet Title 22 <br /> 3• Results a t3'tested to show ' CCR (Safe Dri <br /> approved b an adequate so nkmg Water qct <br /> Prior to final a Y the Environmental source. ), requirements. <br /> approval of im ment Health Department and <br /> prove plans <br /> D. The project shall be served b County Public Works <br /> Joaquin County Enviro y a Public water s <br /> The system shall mnental Health Department <br /> confo <br /> T Provide epartment rmmg to the requirein <br /> quires , Of theCounty <br /> adequate domestic a and the Dep in <br /> ofP Works.San <br /> he production Com et re Warden a and fire water supply Public Works. <br /> well will and the local Fire ct m confonnance to the <br /> provements P] all applicable st District. <br /> Plans or any work andards is re q test well showing within the site, required prior to the approval of the t <br /> NOTE; The Environmental Health <br /> moved to a separate Department reco <br /> relatingParcel area not adjacent <br /> the pro <br /> to drainage and Jacent to the Posed well location be <br /> construction in accordance Ilutants. q source storm Pond because <br /> With theater assessment ma of concerns <br /> E. Construction of in CaliforniaCalf Health and Safetyy be re <br /> individual sew Code.required Prior to <br /> Environmental age <br /> findings Health De -disposal-system(s) <br /> gs °f the Soil Wage <br /> is required under permit <br /> Title, Section 9- ty/Nitrate at the time of develop <br /> and inspection by the <br /> 1110,3 & 9- Loading Study(San Joaquin pment based on the <br /> 1110.4)• quin Co <br /> unt3'Development <br />