Laserfiche WebLink
Recommendations <br /> Action <br /> It is recommended that the Planning Commission: <br /> 1. Approve the Negative Declaration; and <br /> 2. Approve Site Approval Application No. SA-93-45 based on the Findings and subject to the <br /> Conditions of Approval recommended In the staff report. <br /> Findings <br /> 1. The proposed use is consistent with the goals, policies, standards, and maps of the General Plan, <br /> any applicable Master Plan, Specific Plan, and Special Purpose Plan, and any other applicable <br /> plan adopted by the County. <br /> • This Finding can be made because the proposed use Is consistent with the A/G <br /> (General Agriculture) designation of the General Plan. The proposed expansion of <br /> the existing Head Start facility presents no significant General Plan policy issues, and <br /> there are no Master, Specific, or Special Purpose Plans affecting the site. <br /> 2. Adequate utilities,roadway improvements,sanitation,water supply,drainage,and other necessary <br /> facilities have been provided, and the proposed improvements are properly related to existing and <br /> proposed roadways. <br /> • This Finding can be made because the project has public road frontage on River <br /> Road and because all other services are already provided or will be Installed as <br /> Ordinance Requirements In the Conditions of Approval. <br /> 3. The site is physically suitable for the type of development and for the intensity of development. <br /> • This Finding can be made because the proposed project and site plan conform to all <br /> applicable Development Title regulations and requirements. <br /> 4. Issuance of the permit will not be significantly detrimental to the public health, safety, or welfare, <br /> or be injurious to the property or improvements of adjacent properties. <br /> • This Finding can be made because the Initial Study prepared for SA-93-45 found that <br /> the project would not result in any significant, adverse environmental impacts. <br /> 5. The use is compatible with adjoining land uses. <br /> • This Finding can be made because the Initial Study prepared for the project found <br /> that it would not be Incompatible with surrounding land uses. <br /> San Joaquin County SA-93-45/Temple <br /> Community Development Page 6 <br />