Laserfiche WebLink
eco 1G e� 11 Gb tiH61l KtSUUKCt -� LIO`J46kiS163 NO.?07. [794 <br /> MUNN&PERKINS <br /> RECLAMATION PLMV- <br /> PAGE THREE <br /> U. DESCR[PTION OF PROPOSED MINING OPERATION: <br /> A. Ma of O erasions: See attached engineered drawing showing applicable features, <br /> B. Production Scher�le Estimated Annual Production <br /> PHASE 1: <br /> YEAR SAND OVERBURDEN RECLAMATION <br /> 1 50,000 CY 50,000 CY 3 ACRES <br /> 2 50;000 CY 50,000 CY 3 ACRES <br /> 3 50,000 CY 50,000 CY 3 ACRES <br /> 4 .0_ "0- 2 ACRES <br /> TOTAL PRODUCTION: <br /> PHASE L <br /> SAND 150,000 CY <br /> OVERBURDEN 150,000CY <br /> C. MINING PLAN- <br /> 1. Operating Plan: Mining will commence upon permit issuance, with excavation commencing <br /> at the westerly boundary of the project continuing easterly. There will be one phase due <br /> to the size of this project. Excavation is expected to last 2 years with total reclamation,back <br /> to farming capability Completed within 4 years. Trees will be planted in the spring. <br /> 2. Topsoil: <br /> a.Overburden will be stripped and set aside temporarily and will be replaced <br /> continuously and simultaneously as excavated materials are removed. <br /> b.& c. No stockpiles are proposed. <br /> 3. Overb urden/W ante/Ore: <br /> a. Open Pit/Surface Mine <br /> b. Motor Grader C Model 12,Cat 623 Self Loading Scraper, Water Truck <br /> c.No explosives used or stored on project site- <br /> d. Scraper to remove overburden and haul sand to processing plant. <br /> e. Maximum anticipated depth of the mine is 20+J-feet. <br /> f. Maximum depth of mining,bench width and slope angles; refer to cross sections <br /> on engineered drawings. <br /> g. One phase due to small acreage with concurrent reclamation <br /> 4 Mine Waste: Project limited to excavation. No processing on-site. No waste. <br />