My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004096
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
RIVER
>
27865
>
2600 - Land Use Program
>
PA-0200370
>
SU0004096
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:30:30 AM
Creation date
9/9/2019 9:06:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004096
FACILITY_NAME
PA-0200370
STREET_NUMBER
27865
Direction
E
STREET_NAME
RIVER
STREET_TYPE
RD
City
ESCALON
ENTERED_DATE
5/12/2004 12:00:00 AM
SITE_LOCATION
27865 E RIVER RD
RECEIVED_DATE
10/4/2002 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\R\RIVER\27865\PA-0200370\SU0004096\APPL.PDF \MIGRATIONS\R\RIVER\27865\PA-0200370\SU0004096\CDD OK.PDF \MIGRATIONS\R\RIVER\27865\PA-0200370\SU0004096\EH COND.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
166
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PREVIOUSLY APPROVED CONDITIONS OF APPROVAL <br /> Quarry Excavation Application No. PA-0200370 was approved by the Planning Commission <br /> on . The effective date of approval is . This approval will expire on ,which is 18 months from <br /> the date of approval, unless (1) all Conditions of Approval have been complied with, (2) all <br /> necessary building permits have been secured and remain in force, and (3) all necessary <br /> permits from other agencies have been secured and remain in force. <br /> Unless otherwise specified, all Conditions of Approval and ordinance requirements shall be <br /> fulfilled prior to the establishment of the use and the issuance of any building permits. Those <br /> Conditions followed by a Section Number have been identified as ordinance requirements <br /> pertinent to this application. Ordinance requirements cannot be modified; and, other <br /> ordinance requirements may apply. <br /> 1. COMMUNITY DEVELOPMENT DEPARTMENT (Staff Contact: John Funderburg, 468-3160) <br /> a. APPROVAL: This is a Quarry Excavation application to remove approximately 2.4 million <br /> cubic yards of rock, sand, and gravel from approximately 71 acres of an 80-acre site over <br /> a 12 year pefied 26-year period. The mining will occur in three phases. Phase 1 shall <br /> consist of 30 acres to be reclaimed by 2899 2019. Phase 2 shall consist of 15 acres to <br /> be reclaimed by 204 2023. Phase 3 shall consist of 26 acres to be reclaimed by 2936 <br /> 2029. The material that is excavated shall be transported approximately 0.10 miles west <br /> on River Road to an existing processing facility. Reclamation is proposed to be <br /> continuous and concurrent with mining. The quarry shall be replanted in either walnuts or <br /> almonds in 15-to 30-acre increments. <br /> b. STOCKPILING: No stockpiled soil or material shall be placed closer than twenty five (25) <br /> feet to a property boundary. (Development Title Section 9-1415.3[b]) <br /> c. PRIVATE ROADS: All private roads involved in an excavation shall be maintained to <br /> control the creation of dust. The first one hundred (100) feet of any private road on the <br /> property, which intersects, with a publicly maintained road shall be surfaced in a manner <br /> approved by the Director. Traffic control and warning signs shall be installed, if required, at <br /> such intersections. The placement and size of these signs shall be approved by the Director <br /> of Public Works. (Development Title Section 9-1415.3[c]) <br /> d. EROSION CONTROL: Protective vegetative planting, silt screen dams, or other approved <br /> methods shall be required where necessary for the control of erosion. An erosion and <br /> sediment control plan approved by Development Services Division shall be part of the <br /> reclamation plan. (Development Title Section 9-1415.3[d]) <br /> e. HOURS OF OPERATION: Excavation operations shall normally be carried on during the <br /> hours from 5:00 a.m.to 9:00 p.m. (Development Title Section 9-1415.3[f]) <br /> f. REPLACEMENT OF TOPSOIL: The topsoil shall be set aside, and upon completion of an <br /> excavation, the topsoil shall be replaced and the site leveled in conformance with the <br /> excavation permit. (Development Title Section 9-1415.3[g]) <br /> g. WEED CONTROL: If noxious weeds are on the site, operations shall be in accordance with <br /> instructions from the Agriculture Commissioner of San Joaquin County. (Development Title <br /> Section 9-1415.3[h]) <br /> h. HEALTH CONSIDERATIONS: This quarry excavation shall: <br /> (1) Not cause health or sanitary hazards and shall not create conditions which will cause <br /> the breeding or increase of mosquitos, rodents, or other pests. <br /> M Provide an annrnvPd nntahle watar cunnly fnr all emnlnveac <br />
The URL can be used to link to this page
Your browser does not support the video tag.