My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0007882
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
1000
>
2600 - Land Use Program
>
PA-0900184
>
SU0007882
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2023 4:26:04 PM
Creation date
9/9/2019 9:09:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0007882
PE
2627
FACILITY_NAME
PA-0900184
STREET_NUMBER
1000
Direction
E
STREET_NAME
ROTH
STREET_TYPE
RD
City
FRENCH CAMP
APN
19802004 07
ENTERED_DATE
8/25/2009 12:00:00 AM
SITE_LOCATION
1000 E ROTH RD
RECEIVED_DATE
8/24/2009 12:00:00 AM
P_LOCATION
99
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\R\ROTH\1000\PA-0900184\SU0007882\APPL.PDF \MIGRATIONS\R\ROTH\1000\PA-0900184\SU0007882\CDD OK.PDF \MIGRATIONS\R\ROTH\1000\PA-0900184\SU0007882\EH COND.PDF \MIGRATIONS\R\ROTH\1000\PA-0900184\SU0007882\EH PERM.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
273
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> CONSTRUCTION PHASING <br /> The proiect is envisioned to be constructed in two Dhases. <br /> 2011(Phase I� <br /> See Table 1 and Site Plan for a summary of Phase I additions. <br /> Phase 1 includes the lengthening of three existing working tracks, as well as the construction of three new support <br /> tracks.To accommodate lengthening,modate the track len thenin ,the existing gate and maintenance buildings will be demolished and <br /> relocated, and several new support buildings will be constructed.All buildings and significant structures are <br /> anticipated to be completed in Phase I.Two crane maintenance pads will be constructed in Phase I.Additional <br /> parking will be provided for employees, and the employee parking lot access point to Lathrop Road will be <br /> constructed.The main facility entrance at Roth Road will be relocated slightly east of its current position. One septic <br /> system will be removed and a new one will be constructed as part of this phase.To serve the sanitary sewer needs <br /> at the south end of the site,either a connection to the Manteca sanitary sewer system will be established,or <br /> E evaporation basins and a septic system will be constructed.Additional pavement will be constructed to furnish areas <br /> for container bays. Detention and retention basis will be constructed as needed to manage stormwater runoff per <br /> County standards. Finally, lift capacity will be increased to 400,000 lifts per year. <br /> 2022 (Estimated,date subject to change based on market&economic conditions) (Phase ll) <br /> See Table 1 and Site Plan for a summary of Phase II additions. <br /> Phase II construction will consist of two additional working tracks and two additional support tracks, as well as <br /> additional pavement and container bays. Two additional crane maintenance pads and additional site lighting will also <br /> be constructed in this phase. Lift capacity will be further increased to a total capacity of 730,000 lifts per year. To <br /> support the additional lift capacity, more employees and lift equipment will be added (See Table 1) <br /> 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.