Laserfiche WebLink
Mitigation Measures and Statements of Findings of Impacts Being Monitoring/ Responsible <br /> Party for Providing Monitoring/Reporting Timin <br /> Significant and Unavoidable Reporting Action Mitigation Responsibility g <br /> TRANS-9:Prior to the Issuance of building permits for Phase II of the project, Verification by County. Union Pacific San Joaquin County Prior to issuance of building <br /> the project sponsor shall contribute Its fair share of the cast of Installing alraffc Community Development permits for Phase II <br /> signal at the Intersection of Roth Road and 1-5 Northbound Ramp by paying a Department and Public <br /> fair share fee to San Joaquin County equal to the project's equitable fair share Works Department <br /> of 9.8%of such Improvement multiplied by the estimated cost of such <br /> Improvement.Construction of this Improvement would improve the Intersection <br /> LOS to an acceptable LOS B or better.Because San Joaquin County,as Lead <br /> Agency,does not have jurisdiction over this Improvement and it Is uncertain <br /> whether full funding will be achieved for construction of this Improvement,this <br /> Impact is significant and unavoidable. <br /> TRANS-10:Prior to the Issuance of building permits for Phase II of the project, Verification by County. Union Pacific San Joaquin County Prior to issuance of building <br /> the project sponsor shall contribute Its fair share of the cost of the following Community Development permits for Phase II <br /> improvements by paying a fair share fee to San Joaquin County equal to the Department and Public <br /> project's equitable fair share of 12.2%of such Improvements multiplied by the Works Department <br /> estimated cost of such Improvements:(1)Installation of a traffic signal at the <br /> Intersection of Roth Road and Harlan Road,with protective left-turn signal <br /> phasing for Harlan Road approaches,(Ill conversion of the northbound Harlan <br /> Road approach from the existing shared left-turn/through lane and separate <br /> right-turn lane to a separate left-turn lane and shared through/right-turn lane, <br /> and(Iii)conversion of westbound and southbound approaches from shared <br /> left-turn/through/right-turn lane to separate left-turn lane and a shared <br /> through/right turn lane.Construction of the above improvements would Improve <br /> intersection LOS to an acceptable LOS C. Because San Joaquin County,as <br /> Lead Agency,does not have jurisdiction over this Improvement and it is <br /> uncertain whether full funding will be achieved for construction of this <br /> Improvement,this Impact Is significant and unavoidable. <br /> 4.2 Transportation and Traffic(conk) <br /> TRANS-11: Prior to the issuance of building permits for Phase II of the project, Verification by County. Union Pacific San Joaquin County Prior to issuance of building <br /> the project sponsor shall Implement Mitigation Measure TRANS-1 (contribute fair Community Development permits for Phase II <br /> share cost of installation of a traffic signal at the Intersection of Lathrop Road and Department and Public <br /> 1-5 Southbound Ramps,which Improvement Is programmed for Inclusion and Works Department <br /> construction under the RTIF program),and shall contribute Its fair share of the <br /> cost of Installing the following additional Improvements:(i)conversion of the <br /> eastbound approach from shared through/right-turn lane to a separate through <br /> and a separate right-tum lane,and(11)construction of an additional left-tum lane <br /> on the westbound and southbound approaches,which improvements are <br /> programmed for Inclusion and construction,under the RTIF program,by paying <br /> the applicable fees for the project under the RTIF program at the time of building <br /> permit applications.Construction of the above Improvements would improve <br /> Intersection LOS to an acceptable LOS D or better.Because San Joaquin <br /> County,as Lead Agency,does not have jurisdiction over this improvement and <br /> It is uncertain whether full funding will be achieved for construction of this <br /> Improvement,this impact Is significant and unavoidable. <br /> TRANS-12:Prior to the Issuance of building permits for Phase 11 of the project, Verification by County. Union Pacific San Joaquin County Prior to Issuance of building <br /> the project sponsor shall implement Mitigation Measure TRANS-2(contribute fair Community Development permits for Phase 11 <br />