Laserfiche WebLink
Mitigation Measures and Statements of Findings of Impacts Being Monitoring/ Responsible Monitoring/Reporting <br /> Significant and Unavoidable Reporting Action Party for Providing Responsibility Timing <br /> o <br /> Mitigation <br /> share cost of Installation of a traffic signal at the Intersection of Lathrop Road and Department and Public <br /> 1-5 Northbound Ramps,which Improvement is programmed for inclusion and Works Department <br /> construction under the RTIF program),and shall contribute its fair share of the <br /> cost of installing the following additional improvements:(i)construction of an <br /> additional left-turn lane on the eastbound approach,(ii)conversion of the existing <br /> westbound approach from shared through/right-turn lane to separate through and <br /> separate right-turn lane,and(Ili)conversion of the existing shared northbound <br /> approach to shared left-turn/through lane and a free right-turn lane,which <br /> Improvements are programmed for inclusion and construction,under the RTIF <br /> program,by paying the applicable fees for the project under the RTIF program at <br /> the time of building permit applications.Construction of this improvement would <br /> Improve intersection LOS to an acceptable LOS C or better.Because San <br /> Joaquin County,as Lead Agency,does not have jurisdiction over this <br /> Improvement and It Is uncertain whether full funding will be achieved for <br /> construction of this Improvement,this impact is significant and unavoidable. <br /> TRANS-13:Prior to the Issuance of building permits for Phase li of the project, Verification by County. Union Pacific San Joaquin County Prior to Issuance of building <br /> the project sponsor shall contribute its fair share of the cost of installing a traffic Community Development permits for Phase II <br /> signal at the intersection of French Camp Road and SR 99 Southbound Ramps, Department and Public <br /> which improvement is programmed for inclusion and construction, under the Works Department <br /> RTIF program,by paying the applicable fees for the project under the RTIF <br /> 4.2 Transportation and Traffic(cont.) <br /> program at the time of building permit applications.Construction of this <br /> Improvement would improve the Intersection LOS to an acceptable LOS C or <br /> better.Because San Joaquin County,as Lead Agency,does not have <br /> jurisdiction over this Improvement and it is uncertain whether full funding will be <br /> achieved for construction of this Improvement,this Impact is significant and <br /> unavoidable. <br /> TRANS-14: Prior to the issuance of building permits for Phase II of the project, Verification by County. Union Pacific San Joaquin County Prior to issuance of building <br /> the project sponsor shall contribute its fair share of the cost of installing the Community Development permits for Phase II <br /> following improvements: (I)an additional left-turn lane on the southbound Department and Public <br /> Airport Way approach,and(it)an additional left-turn lane on the westbound Works Department <br /> French Camp Road approach,which improvements are programmed for <br /> Inclusion and construction under the San Joaquin County Traffic Impact <br /> Mitigation Fee(TIMF)program,by paying the applicable fees for the project <br /> under the TIMF program at the time of building permit applications. <br /> Construction of these improvements would improve intersection LOS to an <br /> acceptable LOS D. Because this impact occurs only under cumulative <br /> conditions and the project's obligation is to contribute only its fair share of the <br /> cost of these improvements,it is uncertain whether full funding will be achieved <br /> for construction of this Improvement.This impact Is therefore significant and <br /> unavoidable, <br /> TRANS-16:Prior to the Issuance of building permits for Phase II of the project, Verification by County/Re- Union Pacific San Joaquin County Prior to Issuance of building <br /> the project sponsor shall implement Mitigation Measure TRANS-8 and shall verification of Mitigation Community Development permits for Phase II <br /> contribute Its fair share of the cost of Installing the following additional Measure TRANS-8. Department and Public <br /> improvements by payinga fair share fee to San Joaquin County equal to the <br /> l <br />