My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0007882
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
1000
>
2600 - Land Use Program
>
PA-0900184
>
SU0007882
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2023 4:26:04 PM
Creation date
9/9/2019 9:09:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0007882
PE
2627
FACILITY_NAME
PA-0900184
STREET_NUMBER
1000
Direction
E
STREET_NAME
ROTH
STREET_TYPE
RD
City
FRENCH CAMP
APN
19802004 07
ENTERED_DATE
8/25/2009 12:00:00 AM
SITE_LOCATION
1000 E ROTH RD
RECEIVED_DATE
8/24/2009 12:00:00 AM
P_LOCATION
99
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\R\ROTH\1000\PA-0900184\SU0007882\APPL.PDF \MIGRATIONS\R\ROTH\1000\PA-0900184\SU0007882\CDD OK.PDF \MIGRATIONS\R\ROTH\1000\PA-0900184\SU0007882\EH COND.PDF \MIGRATIONS\R\ROTH\1000\PA-0900184\SU0007882\EH PERM.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
273
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mo Hatef -3- <br /> Community Development Department <br /> PA-0900184(UP) <br /> review shall be per the current Public Works fee schedule in place at the time of submittal. (Development <br /> Title Sections 9-1100.3 &9-1150.2) <br /> 6. The Traffic Impact Mitigation Fee shall be required for this development. The fee is due and payable at the <br /> time of building permit application for each phase of the project. The fee will be based on the current <br /> schedule at the time of payment. The fee shall be automatically adjusted July 1 of each year by the <br /> Engineering Construction Cost Index as published by the Engineering News Record. (Resolutions R-00-433) <br /> 7. The Regional Transportation Impact Fee shall be required for this development. The fee is due and payable <br /> at the time of building permit application for each phase of the project. The fee will be based on the current <br /> schedule at the time of payment. (Resolution R-06-38) <br /> 8. Prior to issuance of any building permits for phase 1, applicant shall pay the project's fair share cost for the <br /> following traffic mitigation by paying the applicable fees for the project under the RTIF program at the time <br /> of payment: <br /> a) Installation of a traffic signal at the intersection of Lathrop Road and I-5 southbound ramps. <br /> 9. Prior to issuance of any building permits for phase 1,applicant shall pay the project's fair share cost for the <br /> following traffic mitigation by paying the applicable fees for the project under the RTIF program at the time <br /> of payment: <br /> a) Installation of a traffic signal at the intersection of Lathrop Road and I-5 northbound ramps. <br /> 10. Prior to issuance of any building permits for phase 1, applicant shall pay the project's fair share cost for the <br /> following traffic mitigation by paying the applicable fees for the project under the RTIF program at the time <br /> of payment: <br /> a) Addition of a lane to the southbound State Route 99 freeway segment between French Camp <br /> Road and Lathrop Road. <br /> 11. Prior to issuance of any building permits for phase 2,applicant shall pay the project's fair share traffic <br /> mitigations for site specific traffic impacts as follows: <br /> a) 6.1%of the cost to install a traffic signal at the intersection of Roth Road and I-5 State Route <br /> 3 southbound ramps and the following improvements at that intersection: <br /> I. Conversion of the southbound approach from a left and shared left/through/right tum <br /> lane to a separate left tum lane and a shared right turn/through lane. <br /> H. Installation of an additional left tum lane on the westbound approach. <br /> b) 9.8%of the cost to install a traffic signal at the intersection of Roth Road and 1-5StateRete <br /> 3 northbound ramps. <br /> c) 12.2%of the cost to install a traffic signal at the intersection of Harlan Road and Roth Road <br /> including and the following improvements at that intersection: <br /> I. Conversion of the northbound Harlan Road approach from the existing shared left- <br /> tum/through land and separate right-tum land to a separate left-tum lane and shared <br /> through/right-tum lane. <br /> \\pw Nfp0l\sbms\devservices\dpubme \wmments\up\yr 2009\pa-0900184(upn inter-modal facility-roth rd)\pa-0900184 v6.doc 11-1-12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.