My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0007882
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
1000
>
2600 - Land Use Program
>
PA-0900184
>
SU0007882
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2023 4:26:04 PM
Creation date
9/9/2019 9:09:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0007882
PE
2627
FACILITY_NAME
PA-0900184
STREET_NUMBER
1000
Direction
E
STREET_NAME
ROTH
STREET_TYPE
RD
City
FRENCH CAMP
APN
19802004 07
ENTERED_DATE
8/25/2009 12:00:00 AM
SITE_LOCATION
1000 E ROTH RD
RECEIVED_DATE
8/24/2009 12:00:00 AM
P_LOCATION
99
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\R\ROTH\1000\PA-0900184\SU0007882\APPL.PDF \MIGRATIONS\R\ROTH\1000\PA-0900184\SU0007882\CDD OK.PDF \MIGRATIONS\R\ROTH\1000\PA-0900184\SU0007882\EH COND.PDF \MIGRATIONS\R\ROTH\1000\PA-0900184\SU0007882\EH PERM.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
273
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mo Hatef -4- <br /> Community Development Department <br /> PA-0900184(UP) <br /> H. Conversion of westbound and southbound approaches from shared left- <br /> turn/through/right-turn land to separate left-tum lane and a shared through/right tum <br /> lane. <br /> Fair share payments for mitigations that are included in the RTIF program at the time of payment shall be <br /> credited against the required RTIF fee. <br /> 12. Prior to issuance of any building permits for phase 1,applicant shall pay the project's fair share cost for the <br /> following traffic mitigation by paying the applicable fees for the project under the RTIF program at the time <br /> of payment: <br /> a) Installation of a traffic signal at the intersection of French Camp Road and State Route 99 <br /> southbound ramps. <br /> 13. Prior to issuance of any building permits for phase 2,applicant shall pay the project's fair share cost for the <br /> following traffic mitigations at the intersection of Airport Way and French Camp Road by paying the <br /> applicable fees for the project under the TIMF program at the time of payment: <br /> a) Additional left tum lane on the southbound Airport Way approach. <br /> b) Additional left tum lane on the westbound French Camp Road approach. <br /> 14. Prior to issuance of any building permits for phase 2,applicant shall pay the project's fair share cost for the <br /> following traffic mitigations at the intersection of Airport Way and Daisywood Drive: <br /> a) Installation of a separate left turn lane and a shared through/right tum lane on the eastbound <br /> and westbound Daisywood Drive approaches. <br /> b) Installation of a second southbound through lane. <br /> Fair share payments for mitigations that are included in the RTIF program at the time of payment shall be credited <br /> against the required RTIF fee. <br /> 15. Prior to issuance of any building permits for phase 2,applicant shall pay the project's fair share cost for the <br /> following traffic mitigations at the intersection of Lathrop Road and I-5 southbound ramps by paying the <br /> applicable fees for the project under the RTIF program at the time of payment: <br /> a) Conversion of the eastbound approach from shared through/right turn lane to three separate <br /> through lanes and two free right tum lanes. <br /> b) Construction of one additional left turn lane and two additional through lanes on the <br /> westbound approach. <br /> c) Conversion of the shared left turn/through/right turn lane on the southbound approach to two <br /> left tum lanes,separate through lane and a free right turn lane. <br /> 16. Prior to issuance of any building permits for phase 2,applicant shall pay the project's fair share cost for the <br /> following traffic mitigations at the intersection of Lathrop Road and I-5 northbound ramps by paying the <br /> applicable fees for the project under the RTIF program at the time of payment: <br /> a) Installation of an additional left turn lane on the eastbound approach. <br /> b) Conversion of the existing westbound approach from shared through/right turn lane to three <br /> separate through lanes and a separate free right turn lane. <br /> c) Conversion of the existing shared northbound approach to two left tum lanes, one through lane <br /> and one free right tum lane <br /> \\pw rvfpOI\shares\devservices\dpubsery\comments\up\yr 2009\pa-0900184(upa inter-modal facility-roth rd)\pa-0900184 v6Ad 11-1-12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.