My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0007882
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
1000
>
2600 - Land Use Program
>
PA-0900184
>
SU0007882
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2023 4:26:04 PM
Creation date
9/9/2019 9:09:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0007882
PE
2627
FACILITY_NAME
PA-0900184
STREET_NUMBER
1000
Direction
E
STREET_NAME
ROTH
STREET_TYPE
RD
City
FRENCH CAMP
APN
19802004 07
ENTERED_DATE
8/25/2009 12:00:00 AM
SITE_LOCATION
1000 E ROTH RD
RECEIVED_DATE
8/24/2009 12:00:00 AM
P_LOCATION
99
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\R\ROTH\1000\PA-0900184\SU0007882\APPL.PDF \MIGRATIONS\R\ROTH\1000\PA-0900184\SU0007882\CDD OK.PDF \MIGRATIONS\R\ROTH\1000\PA-0900184\SU0007882\EH COND.PDF \MIGRATIONS\R\ROTH\1000\PA-0900184\SU0007882\EH PERM.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
273
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mo Hatef -5- <br /> Community Development Department <br /> PA-0900184(UP) <br /> 17. Prior to issuance of any building permits for phase 2, applicant shall pay the project's fair share cost for the <br /> following traffic mitigations at the intersection of Airport Way and Lathrop Road by paying the a__" ' r <br /> fees fef the prejeet under the R-TIF pfegFafn at the time ef payment: <br /> a) Installation of an additional through lane on the northbound approach. <br /> b) Installation of an additional left turn lane and conversion of the separate right turn lane to a <br /> shared through/right tum lane on the southbound approach. <br /> c) Conversion of the eastbound approach from'separate left,through and right turn lanes to two <br /> left tum lanes,two through lanes and one right turn lane. <br /> d) Conversion of the westbound approach from a separate left tum lane and a shared <br /> through/right turn lane to one left tum lane,two through lanes and one right turn lane. <br /> Fair share payments for mitigations that are included in the RTIF program at the time of payment shall be <br /> credited against the required RTIF fee. <br /> 18. Prior to issuance of any building permits for phase 2, applicant shall pay the project's fair share cost for the <br /> following traffic mitigations at the intersection of French Camp Road and State Route 99 southbound ramps <br /> by paying the applicable fees for the project under the RTIF program at the time of payment: <br /> a) Conversion of the shared left turn/through lane and separate right turn lane to a separate left <br /> turn lane and a shared through/right turn lane on the northbound and southbound approaches. <br /> 19. Prior to issuance of any building permits for phase 2, applicant shall pay the project's fair share cost for the <br /> following traffic mitigation by paying the applicable fees for the project under the RTIF program at the time <br /> of payment: <br /> a) Installation of a traffic signal at the intersection of State Route 99 Northbound Ramps and <br /> French Camp Road. <br /> 20. Prior to issuance of any building permits for phase 2, applicant shall pay the project's fair share cost for the <br /> following traffic mitigation by paying the applicable fees for the project under the RTIF program at the time <br /> of payment: <br /> a) Addition of a lane to the northbound I-5 freeway segment between Lathrop Road and Roth <br /> Road. <br /> 21. Prior to issuance of any building permits for phase 2,applicant shall pay the project's fair share cost for the <br /> following traffic mitigation by paying the applicable fees for the project under the RTIF program at the time <br /> of payment: <br /> a) Addition of a lane to the northbound I-5 freeway segment between Roth Road and Matthews <br /> Road. <br /> 22. Prior to issuance of any building permits for phase 2,applicant shall pay the project's fair share cost for the <br /> following traffic mitigation by paying the applicable fees for the project under the RTIF program at the time <br /> of payment: <br /> a) Addition of a lane to the southbound I-5 freeway segment between Roth Road and Matthews <br /> Road. <br /> \\pwsryfpOl\shmes\devsemi=\dpubsery\comments\up\yr 2009\pa-0900184(uprr inter-modal facility-Toth rd)\pa-0900184 v6.doex 11-1-12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.