My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0007882
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
1000
>
2600 - Land Use Program
>
PA-0900184
>
SU0007882
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2023 4:26:04 PM
Creation date
9/9/2019 9:09:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0007882
PE
2627
FACILITY_NAME
PA-0900184
STREET_NUMBER
1000
Direction
E
STREET_NAME
ROTH
STREET_TYPE
RD
City
FRENCH CAMP
APN
19802004 07
ENTERED_DATE
8/25/2009 12:00:00 AM
SITE_LOCATION
1000 E ROTH RD
RECEIVED_DATE
8/24/2009 12:00:00 AM
P_LOCATION
99
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\R\ROTH\1000\PA-0900184\SU0007882\APPL.PDF \MIGRATIONS\R\ROTH\1000\PA-0900184\SU0007882\CDD OK.PDF \MIGRATIONS\R\ROTH\1000\PA-0900184\SU0007882\EH COND.PDF \MIGRATIONS\R\ROTH\1000\PA-0900184\SU0007882\EH PERM.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
273
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mo Hatef -6- <br /> Community Development Department <br /> PA-0900184(UP) <br /> 23. Prior to issuance of any building permits for phase 2, applicant shall pay the project's fair share cost for the <br /> following traffic mitigation by paying the applicable fees for the project under the RTIF program at the time <br /> of payment: <br /> a) Addition of a lane to the northbound State Route 99 segment between French Camp Road and <br /> Lathrop Road. <br /> 24. Prior to issuance of any building permits for phase 2,applicant shall pay the project's fair share cost for the <br /> following traffic mitigation by paying the applicable fees for the project under the RTIF program at the time <br /> of payment: <br /> a) Addition of a lane to the southbound State Route 99 segment between French Camp Road and <br /> Lathrop Road. <br /> 25. Prior to issuance of any building permits for phase 2,applicant shall pay the project's fair share cost for the <br /> following traffic mitigation by paying the applicable fees for the project under the RTIF program at the time <br /> of building permit applications if such improvement is included within the program at the time of building <br /> permit applications, or alternatively,if such improvement is not included under the RTIF program at the time <br /> of building permit applications,by paying fees to San Joaquin County for such improvement, based upon the <br /> project's equitable fair share of the cost of such improvement, if an alternative fee collection program exists <br /> for such improvement at the time of building permit applications which the County determines is part of a <br /> reasonable, enforceable plan or program that is sufficiently tied to the actual mitigation of the traffic impacts <br /> at issue: <br /> a) Construction of a grade separation overpass at the UPRR crossing on Roth Road.(east of <br /> Sharpe Army Depot) <br /> 26. Total estimated improvement costs for all fair share calculations shall be determined by the San Joaquin <br /> County Department of Public Works. <br /> 27. A copy of the final site plan shall be submitted prior to release of building permit for each phase of the <br /> project. <br /> 28. Verification shall be obtained from the Solid Waste Division(468-3066)that this development has met the <br /> requirements of the Waste Plan Format for development projects. A final site plan is required upon submittal <br /> of verification for each phase of the project. <br /> 29. Provide drainage facilities for each phase of the project that meet the requirements of San Joaquin County <br /> Development Standards to prevent the increased runoff release rate of storm water from discharging onto <br /> other properties,except for industrial wastewater(storm drain and washdown runoff)as outlined in Public <br /> Works condition of approval 32.A drainage report and drainage plans for on-site drainage covering the entire <br /> project,prepared and signed by a registered civil engineer, shall be submitted to the Department of Public <br /> Works for review and approval.The plans shall include design specifications for all stormwater control <br /> facilities proposed for the project site,including stormwater retention ponds, stormwater collection and <br /> conveyance improvements. The drainage report and drainage plans are subject to plan check fees and must be <br /> approved by the Department of Public Works prior to the issuance of the building permit for Phase 1 of the <br /> project. (Development Title Section 9-1135) <br /> \\pwstvfp0l\shares\devservicn\dpubscm\comments\up\yr 2009\pa-0900184(upu inter-modal facility-roth rd)\pa-0900184 v6.dwx 11-1-12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.