Laserfiche WebLink
Mo Hatef -6- <br /> Community Development Department <br /> PA-0900184(UP) <br /> 23. Prior to issuance of any building permits for phase 2, applicant shall pay the project's fair share cost for the <br /> following traffic mitigation by paying the applicable fees for the project under the RTIF program at the time <br /> of payment: <br /> a) Addition of a lane to the northbound State Route 99 segment between French Camp Road and <br /> Lathrop Road. <br /> 24. Prior to issuance of any building permits for phase 2,applicant shall pay the project's fair share cost for the <br /> following traffic mitigation by paying the applicable fees for the project under the RTIF program at the time <br /> of payment: <br /> a) Addition of a lane to the southbound State Route 99 segment between French Camp Road and <br /> Lathrop Road. <br /> 25. Prior to issuance of any building permits for phase 2,applicant shall pay the project's fair share cost for the <br /> following traffic mitigation by paying the applicable fees for the project under the RTIF program at the time <br /> of building permit applications if such improvement is included within the program at the time of building <br /> permit applications, or alternatively,if such improvement is not included under the RTIF program at the time <br /> of building permit applications,by paying fees to San Joaquin County for such improvement, based upon the <br /> project's equitable fair share of the cost of such improvement, if an alternative fee collection program exists <br /> for such improvement at the time of building permit applications which the County determines is part of a <br /> reasonable, enforceable plan or program that is sufficiently tied to the actual mitigation of the traffic impacts <br /> at issue: <br /> a) Construction of a grade separation overpass at the UPRR crossing on Roth Road.(east of <br /> Sharpe Army Depot) <br /> 26. Total estimated improvement costs for all fair share calculations shall be determined by the San Joaquin <br /> County Department of Public Works. <br /> 27. A copy of the final site plan shall be submitted prior to release of building permit for each phase of the <br /> project. <br /> 28. Verification shall be obtained from the Solid Waste Division(468-3066)that this development has met the <br /> requirements of the Waste Plan Format for development projects. A final site plan is required upon submittal <br /> of verification for each phase of the project. <br /> 29. Provide drainage facilities for each phase of the project that meet the requirements of San Joaquin County <br /> Development Standards to prevent the increased runoff release rate of storm water from discharging onto <br /> other properties,except for industrial wastewater(storm drain and washdown runoff)as outlined in Public <br /> Works condition of approval 32.A drainage report and drainage plans for on-site drainage covering the entire <br /> project,prepared and signed by a registered civil engineer, shall be submitted to the Department of Public <br /> Works for review and approval.The plans shall include design specifications for all stormwater control <br /> facilities proposed for the project site,including stormwater retention ponds, stormwater collection and <br /> conveyance improvements. The drainage report and drainage plans are subject to plan check fees and must be <br /> approved by the Department of Public Works prior to the issuance of the building permit for Phase 1 of the <br /> project. (Development Title Section 9-1135) <br /> \\pwstvfp0l\shares\devservicn\dpubscm\comments\up\yr 2009\pa-0900184(upu inter-modal facility-roth rd)\pa-0900184 v6.dwx 11-1-12 <br />