Laserfiche WebLink
• Two 1,080 square foot portal buildings <br /> • Two 1,600 square foot storage buildings <br /> • 280 square foot crew shanty <br /> • 135 square foot IWTP(Industrial Wastewater Treatment Plant) building <br /> • 1,500 square foot IWTP (Industrial Wastewater Treatment Plans) canopy <br /> 588 square foot sludge drying bed canopy <br /> • 2,000 square foot Mechanical Forces Building <br /> Two 3,360 square foot truck canopies <br /> 6,270 square foot Inspection Pit canopy <br /> • 9,400 square foot Roadability canopy <br /> • 200 square foot Passenger Shelter canopy <br /> • Replace existing 120 foot communications tower with a 140 foot tall communications <br /> tower <br /> • Addition of a ten lane automated gate system to reduce truck processing and idling <br /> time <br /> • Relocate the existing main entrance to the facility further east on Roth Road and <br /> away from the intersection of Roth Road and the Union Pacific main line. Trucks <br /> transporting cargo units and Union Pacific employees who work in the gate building <br /> will enter the facility via this entrance. Union Pacific employees who do not work in <br /> the gate building will enter the facility at the south end of the site via an indirect <br /> connection from Lathrop Road. Trucks transporting cargo units will not be allowed to <br /> enter the facility via Lathrop Road. <br /> • Add additional turn lanes on Roth Road at the relocated facility entrance to <br /> accommodate additional traffic. <br /> • Construct two crane maintenance pads. <br /> • Construct a private, internal access road between the Lathrop Intermodal Facility and <br /> the proposed CenterPoint Properties Intermodal Center, so that goods can be <br /> transported between the facilities without the use of public roads. <br /> • Upgrade and modernize intermodal yard equipment throughout the facility. <br /> Phase II (building permits to be issued ten years from the effective date of approval) includes <br /> the following: <br /> • Construct two additional working tracks totaling 13,760 feet and two additional <br /> support tracks totaling 15,276 feet.At full buildout, there will be 36,550 feet of <br /> working tracks,40,655 feet of support tracks, and 1,906 feet of engine ready track. <br />