My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0010231
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
1000
>
2600 - Land Use Program
>
PA-0900184
>
SU0010231
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2024 4:16:32 PM
Creation date
9/9/2019 9:09:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0010231
PE
2656
FACILITY_NAME
PA-0900184
STREET_NUMBER
1000
Direction
E
STREET_NAME
ROTH
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231-
ENTERED_DATE
9/19/2014 12:00:00 AM
SITE_LOCATION
1000 E ROTH RD
RECEIVED_DATE
12/21/2023 12:00:00 AM
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
FilePath
\MIGRATIONS\R\ROTH\1000\PA-0900184\SU0010231\APPL.PDF \MIGRATIONS\R\ROTH\1000\PA-0900184\SU0010231\CDD OK.PDF \MIGRATIONS\R\ROTH\1000\PA-0900184\SU0010231\EH COND.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Responsible <br /> Mitigation Measures and Statements of Findings of Impacts Being Monitoring! Monitoring/Reporting <br /> Significant and Unavoidable Reporting Action Party for Providing Responsibility Timing <br /> Mitigation <br /> i <br /> share cost of installation of a traffic signal at the intersection of Lathrop Road and { Department and Public <br /> 1-5 Northbound Ramps,which improvement is programmed for inclusion and Works Department <br /> construction under the RTIF program),and shall contribute its fair share of the <br /> cost of installing the following additional Improvements.(i)construction of an j <br /> additional left-turn lane on the eastbound approach,(ii)conversion of the existing i <br /> westbound approach from shared through/right-turn lane to separate through and I <br /> separate right-turn lane,and(iii)conversion of the existing shared northbound I <br /> approach to shared left-turn/through lane and a free right-turn lane,which <br /> improvements are programmed for inclusion and construction,under the RTIF <br /> program,by paying the applicable fees for the project under the RTIF program at <br /> the time of building permit applications.Construction of this improvement would <br /> improve intersection LOS to an acceptable LOS C or better.Because San <br /> Joaquin County,as Lead Agency,does not have jurisdiction over this <br /> improvement and it is uncertain whether full funding will be achieved for <br /> construction of this improvement,this impact is significant and unavoidable. { <br /> TRANS-13:Prior to the issuance of building permits for Phase II of the project, Verification by County. Union Pacific San Joaquin County Prior to issuance of building <br /> the project sponsor shall contribute its fair share of the cost of installing a traffic Community Development permits for Phase II <br /> signal at the intersection of French Camp Road and SR 99 Southbound Ramps, Department and Public <br /> which improvement is programmed for inclusion and construction,under the Works Department <br /> RTIF program,by paying the applicable fees for the project under the RTIF <br /> 42 TrdIISNOr1at10(1 and Traffic(GOnt.) rz <br /> d <br /> program at the time of building permit applications.Construction of this <br /> improvement would Improve the intersection LOS to an acceptable LOS C or <br /> better.Because San Joaquin County,as Lead Agency,does not have <br /> jurisdiction over this improvement and it is uncertain whether full funding will be <br /> achieved for construction of this improvement,this impact is significant and <br /> unavoidable. - <br /> TRANS-14:Prior to the issuance of building permits for Phase II of the project, Verification by County. Union Pacific San Joaquin County Prior to issuance of building <br /> the project sponsor shall contribute its fair share of the cost of installing the Community Development permits for Phase II <br /> following improvements:(i)an additional left-turn lane on the southbound Department and Public <br /> Airport Way approach,and(ii)an additional left-turn lane on the westbound Works Department <br /> French Camp Road approach,which improvements are programmed for <br /> inclusion and construction under the San Joaquin County Traffic Impact <br /> Mitigation Fee(TIMF)program,by paying the applicable fees for the project <br /> under the TIMF program at the time of building permit applications. <br /> Construction of these improvements would improve intersection LOS to an <br /> acceptable LOS D.Because this impact occurs only under cumulative <br /> conditions and the project's obligation is to contribute only its fair share of the i <br /> cost of these improvements,it is uncertain whether full funding will be achieved <br /> for construction of this improvement.This impact Is therefore significant and <br /> unavoidable. <br /> TRANS-15:Prior to the issuance of building permits for Phase II of the project, Verification by County/Re- Union Pacific San Joaquin County Prior to issuance of building <br /> the project sponsor shall implement Mitigation Measure TRANS-8 and shall verification of Mitigation Community Development permits for Phase II <br /> contribute its fair share of the cost of installing the following additional Measure TRANS-8. Department and Public <br /> improvements by payinga fair share fee to San Joaquin County equal to the <br />
The URL can be used to link to this page
Your browser does not support the video tag.