Laserfiche WebLink
Responsible <br /> Mitigation Measures and Statements of Findings of Impacts Being Monitoring! Monitoring/Reporting <br /> Significant and Unavoidable Reporting Action Party for Providing Responsibility Timing <br /> Mitigation <br /> i <br /> share cost of installation of a traffic signal at the intersection of Lathrop Road and { Department and Public <br /> 1-5 Northbound Ramps,which improvement is programmed for inclusion and Works Department <br /> construction under the RTIF program),and shall contribute its fair share of the <br /> cost of installing the following additional Improvements.(i)construction of an j <br /> additional left-turn lane on the eastbound approach,(ii)conversion of the existing i <br /> westbound approach from shared through/right-turn lane to separate through and I <br /> separate right-turn lane,and(iii)conversion of the existing shared northbound I <br /> approach to shared left-turn/through lane and a free right-turn lane,which <br /> improvements are programmed for inclusion and construction,under the RTIF <br /> program,by paying the applicable fees for the project under the RTIF program at <br /> the time of building permit applications.Construction of this improvement would <br /> improve intersection LOS to an acceptable LOS C or better.Because San <br /> Joaquin County,as Lead Agency,does not have jurisdiction over this <br /> improvement and it is uncertain whether full funding will be achieved for <br /> construction of this improvement,this impact is significant and unavoidable. { <br /> TRANS-13:Prior to the issuance of building permits for Phase II of the project, Verification by County. Union Pacific San Joaquin County Prior to issuance of building <br /> the project sponsor shall contribute its fair share of the cost of installing a traffic Community Development permits for Phase II <br /> signal at the intersection of French Camp Road and SR 99 Southbound Ramps, Department and Public <br /> which improvement is programmed for inclusion and construction,under the Works Department <br /> RTIF program,by paying the applicable fees for the project under the RTIF <br /> 42 TrdIISNOr1at10(1 and Traffic(GOnt.) rz <br /> d <br /> program at the time of building permit applications.Construction of this <br /> improvement would Improve the intersection LOS to an acceptable LOS C or <br /> better.Because San Joaquin County,as Lead Agency,does not have <br /> jurisdiction over this improvement and it is uncertain whether full funding will be <br /> achieved for construction of this improvement,this impact is significant and <br /> unavoidable. - <br /> TRANS-14:Prior to the issuance of building permits for Phase II of the project, Verification by County. Union Pacific San Joaquin County Prior to issuance of building <br /> the project sponsor shall contribute its fair share of the cost of installing the Community Development permits for Phase II <br /> following improvements:(i)an additional left-turn lane on the southbound Department and Public <br /> Airport Way approach,and(ii)an additional left-turn lane on the westbound Works Department <br /> French Camp Road approach,which improvements are programmed for <br /> inclusion and construction under the San Joaquin County Traffic Impact <br /> Mitigation Fee(TIMF)program,by paying the applicable fees for the project <br /> under the TIMF program at the time of building permit applications. <br /> Construction of these improvements would improve intersection LOS to an <br /> acceptable LOS D.Because this impact occurs only under cumulative <br /> conditions and the project's obligation is to contribute only its fair share of the i <br /> cost of these improvements,it is uncertain whether full funding will be achieved <br /> for construction of this improvement.This impact Is therefore significant and <br /> unavoidable. <br /> TRANS-15:Prior to the issuance of building permits for Phase II of the project, Verification by County/Re- Union Pacific San Joaquin County Prior to issuance of building <br /> the project sponsor shall implement Mitigation Measure TRANS-8 and shall verification of Mitigation Community Development permits for Phase II <br /> contribute its fair share of the cost of installing the following additional Measure TRANS-8. Department and Public <br /> improvements by payinga fair share fee to San Joaquin County equal to the <br />