My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0010231
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
1000
>
2600 - Land Use Program
>
PA-0900184
>
SU0010231
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2024 4:16:32 PM
Creation date
9/9/2019 9:09:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0010231
PE
2656
FACILITY_NAME
PA-0900184
STREET_NUMBER
1000
Direction
E
STREET_NAME
ROTH
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231-
ENTERED_DATE
9/19/2014 12:00:00 AM
SITE_LOCATION
1000 E ROTH RD
RECEIVED_DATE
12/21/2023 12:00:00 AM
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
FilePath
\MIGRATIONS\R\ROTH\1000\PA-0900184\SU0010231\APPL.PDF \MIGRATIONS\R\ROTH\1000\PA-0900184\SU0010231\CDD OK.PDF \MIGRATIONS\R\ROTH\1000\PA-0900184\SU0010231\EH COND.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mitigation Measures and Statements of Findings of Impacts Being Monitoring! Responsible Monitoring/Reporting <br /> Significant and Unavoidable Reporting Action Party for Providing Responsibility Timing <br /> Mitigation <br /> construction of this improvement,this impact is significant and unavoidable. <br /> TRANS-19:Prior to the issuance of building permits for Phase II of the project, Verification by County. Union Pacific San Joaquin County Prior to issuance of building <br /> the project sponsor shall implement Mitigation Measure TRANS-1 (contribute Community Development permits for Phase Il <br /> fair share of the cost of installation of a traffic signal at the intersection of Department and Public <br /> Lathrop Road and 1-5 Southbound Ramps,which improvement is programmed Works Department <br /> for inclusion and construction under the RTIF program),and shall contribute its <br /> 4,2 Transportation and Tr� <br /> I afflc(cont) - <br /> - i <br /> fair share of the cost of installing the following additional improvements,to the i <br /> extent the project has not already contributed its fair share by implementing <br /> Mitigation Measure TRANS-11:(1)conversion of the eastbound approach from <br /> shared through/right-turn lane to three separate through lanes and two free <br /> right-turn lanes,(ii)construction of one additional left-turn lane and two <br /> additional through lanes on the westbound approach,and(iii)conversion of the <br /> shared left-turn/through/right-turn lane on the southbound approach to two left- <br /> turn lanes,separate through lane and a free right-turn lane,which <br /> improvements are programmed for inclusion and construction,under the RTIF <br /> program,by paying the applicable fees for the project under the RTIF program <br /> at the time of building permit applications.Construction of these improvements <br /> would improve intersection LOS to an acceptable LOS C or better.Because <br /> San Joaquin County,as Lead Agency,does not have jurisdiction over this <br /> improvement and it is uncertain whether full funding will be achieved for <br /> construction of this improvement,this impact is significant and unavoidable. <br /> TRANS-20:Prior to the issuance of building permits for Phase II of the project, Verification by County. Union Pacific San Joaquin County Prior to issuance of building <br /> the project sponsor shall implement Mitigation Measure TRANS-2(installation Community Development permits for Phase II <br /> of a traffic signal at the intersection of Lathrop Road and 1-5 Northbound Department and Public <br /> Ramps,which improvement is programmed for inclusion and construction Works Department <br /> under the RTIF program),and shall contribute its fair share of the cost of <br /> installing the following additional improvements,to the extent the project has <br /> not already contributed its fair share by implementing Mitigation Measure <br /> TRANS-12:(i)construction of an additional left-turn lane on the eastbound <br /> approach,(ii)conversion of the existing westbound approach from shared <br /> through/right-turn lane to three separate through lanes and a separate free right <br /> turn lane,and(iii)conversion of the existing shared northbound approach to two <br /> left-turn lanes,one through lane and one free right-turn lane,which <br /> improvements are programmed for inclusion and construction,under the RTIF <br /> program,by paying the applicable fees for the project under the RTIF program at <br /> the time of building permit applications.Construction of these improvements <br /> would improve intersection LOS to an acceptable LOS D or better.Because <br /> San Joaquin County,as Lead Agency,does not have jurisdiction over this <br /> improvement and it is uncertain whether full funding will be achieved for <br /> construction of this improvement,this impact is significant and unavoidable. <br /> TRANS-21:Prior to the issuance of building permits for Phase II of the project, Verification by County. Union Pacific San Joaquin County Prior to issuance of building <br /> the project sponsor shall contribute its fair share of the cost of the following Community Development permits for Phase 11 <br /> improvements by paying the applicable fees for the project under the RTIF Department and Public <br />
The URL can be used to link to this page
Your browser does not support the video tag.