Laserfiche WebLink
Mitigation Measures and Statements of Findings of Impacts Being Monitoring/ Responsible Monitoring/Reporting <br /> Significant and Unavoidable Reporting Action Party for Providing Responsibility Timing <br /> Mitigation <br /> -F-ii <br /> ......... 20 <br /> ........... <br />_4 . <br /> TRANS 23:Prior to the issuance of building permits for Phase 11 of the project, Verification by County. Union Pacific I San Joaquin County Prior to issuance of building <br /> the project sponsor shall contribute its fair share of the cost of installing a traffic Community Development permits for Phase 11 <br /> signal at the intersection of SIR 99 Northbound Ramps and French Camp Department and Public <br /> Road,which improvement is programmed for inclusion and construction,by Works Department <br /> paying the applicable fees for the project under the RTIF program at the time of <br /> building permit applications.Construction of this improvement would improve <br /> intersection LOS to an acceptable LOS C or better.Because San Joaquin <br /> County,as Lead Agency,does not have jurisdiction over this improvement and <br /> it is uncertain whether full funding will be achieved for construction of this <br /> improvement,this impact is significant and unavoidable. <br /> TRANS-24:Prior to the issuance of building permits for Phase 11 of the project, Verification by County. Union Pacific San Joaquin County Prior to issuance of building <br /> the project sponsor shall contribute its fair share of the cost of adding a lane to Community Development permits for Phase 11 <br /> the northbound 1-5 freeway segment between Lathrop Road and Rath Road, Department and Public <br /> which improvements are programmed for inclusion and construction under the Works Department <br /> RTIF program,by paying the applicable fees for the project under the RTIF <br /> program at the time of building permit applications.This mitigation measure <br /> would be consistent with Caltrans'Interstate 5 TCR,which identifies this <br /> section of the freeway to be ultimately widened to ten lanes(five in each <br /> direction including one HOV lane).Construction of this improvement would <br /> improve freeway LOS to an acceptable LOS C or better.Because San Joaquin <br /> County,as Lead Agency,does not have jurisdiction over this improvement and <br /> it is uncertain whether full funding will be achieved for construction of this <br /> improvement,this impact is significant and unavoidable. <br /> TRANS-25:Prior to the issuance of building permits for Phase 11 of the project, Verification by County. Union Pacific San Joaquin County Prior to issuance of building <br /> the project sponsor shall contribute its fair share of the cost of adding a lane to Community Development permits for Phase 11 <br /> the northbound 1-5 freeway segment between Roth Road and Mathews Road, Department and Public <br /> which improvements are programmed for inclusion and construction under the Works Department <br /> RTIF program,by paying the applicable fees for the project under the RTIF <br /> program at the time of building permit applications.This mitigation measure <br /> would be consistent with Caltrans'Interstate 5 TCR,which identifies this section <br /> of the freeway to be ultimately widened to ten lanes(five in each direction <br /> including one HOV lane).Construction of this improvement would improve <br /> freeway LOS to an acceptable LOS C or better.Because San Joaquin County, <br /> as Lead Agency,does not have jurisdiction over this improvement and it is <br /> uncertain whether full funding will be achieved for construction of this <br /> improvement,this impact is significant and unavoidable. -----------------77- <br /> 01 <br /> ......... <br /> 64F0z <br /> .......... <br /> . <br /> TRANS-26:There is no feasible measure to mitigate the impact to a less-than- NIA N/A NIA NIA <br /> significant level.Addition of two mixed-flow lanes to the southbound 1-5 freeway <br /> segment between Mathews Road and Roth Road would be required to mitigate <br /> the impact to a less-than-significant level,but that would be inconsistent with <br /> Caltrans'Interstate 5 TCR,which identifies this section of the freewa to be. <br />