My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0010231
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
1000
>
2600 - Land Use Program
>
PA-0900184
>
SU0010231
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2024 4:16:32 PM
Creation date
9/9/2019 9:09:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0010231
PE
2656
FACILITY_NAME
PA-0900184
STREET_NUMBER
1000
Direction
E
STREET_NAME
ROTH
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231-
ENTERED_DATE
9/19/2014 12:00:00 AM
SITE_LOCATION
1000 E ROTH RD
RECEIVED_DATE
12/21/2023 12:00:00 AM
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
FilePath
\MIGRATIONS\R\ROTH\1000\PA-0900184\SU0010231\APPL.PDF \MIGRATIONS\R\ROTH\1000\PA-0900184\SU0010231\CDD OK.PDF \MIGRATIONS\R\ROTH\1000\PA-0900184\SU0010231\EH COND.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Responsible <br /> Mitigation Measures and Statements of Findings of Impacts Being Monitoring! Party for Providing Monitoring/Reporting Timing <br /> Significant and Unavoidable Reporting Action Mitigation Responsibility <br /> ultimately widened to ten lanes(five in each direction including one HOV lane). <br /> Widening the segment by one mixed-flow lane and one HOV lane(consistent <br /> with the Interstate 5 TCR)would improve the service level,but only to an <br /> unacceptable LOS E.This impact is therefore significant and unavoidable. <br /> TRANS-27:There is no feasible measure to mitigate the impact to a less-than- N/A NIA N/A WA <br /> significant level.Addition of two mixed-flow lanes to the southbound 1-5 freeway <br /> segment between Roth Road and Lathrop Road would be required to mitigate <br /> the impact to a less-than-significant level,but that would be inconsistent with <br /> Caltrans'Interstate 5 TCR,which identifies this section of the freeway to be <br /> ultimately widened to ten lanes(five in each direction including one HOV lane). <br /> Widening the segment by one mixed-flow lane and one HOV lane(consistent <br /> with the Interstate 5 TCR)would improve the service level,but only to an <br /> unacceptable LOS E.This impact is therefore significant and unavoidable. <br /> TRANS-28:Prior to the issuance of building permits for Phase 11 of the project, Verification by County. Union Pacific San Joaquin County Prior to issuance of building <br /> the project sponsor shall implement Mitigation Measure TRANS-24(contribute Community Development permits for Phase II <br /> fair share of the cost of adding a lane to the northbound 1-5 freeway segment Department and Public <br /> between Lathrop Road and Roth Road,which improvement is programmed for Works Department <br /> inclusion and construction under the RTIF program and is consistent with <br /> Caltrans'Interstate 5 TCR)by paying the applicable fees for the project under <br /> I <br /> the RTIF program at the time of building permit applications.Construction of <br /> the improvement described in Mitigation Measure TRANS-24 would improve <br /> merge operation LOS to an acceptable LOS D.Because San Joaquin County, j <br /> as Lead Agency,does not have jurisdiction over this improvement and it Is <br /> uncertain whether full funding will be achieved for construction of this j <br /> improvement,this impact is significant and unavoidable. <br /> TRANS-29: Prior to the issuance of building permits for Phase 11 of the project, Verification by County. Union Pacific San Joaquin County Prior to issuance of building <br /> the project sponsor shall contribute its fair share of the cost of adding a lane to Community Development permits for Phase II <br /> the southbound 1-5 freeway segment between Mathews Road and Roth Road, Department and Public <br /> which improvement is programmed for inclusion and construction under the Works Department i <br /> RTIF program and is consistent with Caltrans'Interstate 5 TCR, by paying the <br /> applicable fees for the project under the RTIF program at the time of building ' <br /> permit applications.Construction of this improvement would improve merge <br /> operation LOS to an acceptable LOS D Because San Joaquin County,as <br /> .:r <br /> 4.2 Transportation and Traffic(cont} U n<t . <br /> a <br /> Lead Agency,does not have jurisdiction over this improvement and it is <br /> uncertain whether full funding will be achieved for construction of this <br /> improvement,this impact is significant and unavoidable. <br /> TRANS-30:There is no feasible measure to mitigate the impact to a less-than- N/A N/A N/A N/A <br /> significant level.As described above,adding one additional mixed-flow lane and <br /> an HOV lane to the freeway segment would improve the service level to LOS E <br /> (remaining unacceptable).To fully mitigate the Impact,a second additional <br /> mixed-flow lane would be required,which is beyond what has been identified in <br />
The URL can be used to link to this page
Your browser does not support the video tag.