My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004114
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SANTA FE
>
23808
>
2600 - Land Use Program
>
QX-99-0003
>
SU0004114
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2020 4:28:01 PM
Creation date
9/9/2019 10:08:24 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004114
FACILITY_NAME
QX-99-0003
STREET_NUMBER
23808
Direction
S
STREET_NAME
SANTA FE
STREET_TYPE
RD
City
ESCALON
ENTERED_DATE
5/12/2004 12:00:00 AM
SITE_LOCATION
23808 S SANTA FE RD
RECEIVED_DATE
12/28/1998 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\S\SANTA FE\23808\QX-99-03\SU0004114\EH TRACK LOG.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
QUARRY EXCAVATION APPLICATION <br /> RECLAMATION PLAN—AGGREGATES, INC. <br /> PAGE THREE <br /> B. PRODUCTION SCHEDULE: <br /> Phase I- <br /> 2001 - - - - - -100,000 CY <br /> 2002 - - - - - -100,000 CY <br /> 2003 - - -- - -100,000 CY <br /> 2004 - - - - - -100,000 CY <br /> 2005 - - - - - -100,000 CY <br /> Total Reclamation of Phase I, 40 acres - - - - -2007 <br /> Phase 11- <br /> 2006 - - - - - -100,000 CY <br /> 2007 - - - - - -100,000 CY <br /> 2008 - - - - - -100,000 CY <br /> 2009 -- -- - -100,000 CY <br /> 2010 - - - - - -100,000 CY <br /> Total Reclamation of Phase Il, 40 acres - - - - - 2012 <br /> Total anticipated production for the life of the project is estimated to be 1,000,000 <br /> CY of aggregates. Based on anticipated production,product availability,weather, <br /> economy and demand for materials, it is expected the excavation will take 10 <br /> years with total reclamation back to farming capability in 12 years. <br /> C. MINING PLAN: <br /> 1. OPERATING PLAN: Excavation will commence at the south eastern <br /> portion of the parcel,mining east to west and back west to east in a northerly <br /> direction. Almond trees in Phase 1I will continue to be farmed and <br /> en �1 sted <br /> until excavation is comlethe months Mar hperation is Octoberseasonal, g Y <br /> excavation occurs during <br /> 2. TOPSOIL: Reclamation is concurrent with mining. Scraper strips the <br /> topsoil which is placed temporarily in a stockpile until such time area of <br /> excavation allows replacing the topsoil. As excavation progresses,topsoil is <br /> replaced in excavated area. <br />
The URL can be used to link to this page
Your browser does not support the video tag.