Laserfiche WebLink
Thomas M. Gau -2- <br /> COMMENTS ON DEVELOPMENTS <br /> SA-96-02 REVISION <br /> 3 . The frontage improvements for Flag City Boulevard shall be <br /> constructed in conformance with the standards for one-half of a <br /> 60-foot right-of-way commercial street . <br /> (Development Title Section 9-1150 .2) <br /> 4 . The Traffic Impact Mitigation Fee will be required for this <br /> development . The fee is due and payable at the time of building <br /> permit application. (The fee currently is $3 , 120 per 1, 000 gross <br /> square foot of building as Retail service or $138 . 69 per daily . <br /> trip-end generated in the Lodi area. The fee shall be automatically <br /> adjusted July 1 of each year by the Engineering Construction Cost <br /> Index as published by the Engineering News Record. ) <br /> (Resolutions R-90-304, R-91-1025, R-93-167, R-94-174 and R-95-650) <br /> 5 . A retention pond will be required for this development when the <br /> 20-acre limit is exceeded and securities shall be provided prior <br /> to issuance of any building permit to ensure its construction. <br /> Location of the pond shall be determined and easement provided. <br /> (Minor subdivision MS-94-42, Condition 2h) <br /> 6 . A 10, 000-gallon storage tank with fire pumps will be required to <br /> serve the project . <br /> (Minor Subdivision MS-94-42, Condition 2i) <br /> TMI :RH:ne <br /> PS-6C130.N1 <br /> E: Manuel Lopez, Deputy Director/Development <br />