Laserfiche WebLink
calculated by,a registered civil engineer, licensed contractor, or licensed architect prior to the release <br /> of building permits. (Development Title Section 9=1135) <br /> b. The Traffic Impact Mitigation Fee shall be required for each phase of this development. The fee is <br /> r' <br /> due and paykle at the time of each building permit application. The fee will be based on the current <br /> schedule at the time of payment. The fee shall be automatically adjust July 1 of each year by the <br /> Engineering Construction Cost Index as published by the Engineering News Record. (Resolution R- <br /> 00-433) T: <br /> c. The Regional�Transportation Impact Fee shall be required for each phase of this development: The <br /> fee is due and payable at the time of each building permit application. The fee will.be based on the <br /> current schedule at the time of payment. (Resolution R-06-38) <br /> d. A copy of the'-Final Site Plan shall be submitted prior to the release of building permits. <br /> e. Verification shall be obtained from the Solid Waste Division (468-3066)that this development has <br /> met the requirements of the Waste Plan Format for Development Projects. The Final Site Plan is <br /> required upon submittal of verification. <br /> f. Dischargers whose project disturb one or more acres of soil or whose projects disturb less than one <br /> acre but are:part of a larger common plan of development that in total disturbs one or more acres are <br /> required to obtain coverage under the General Permit for Discharges of Storm Water Associated <br /> With Construction Activity(Construction General Permit 99-08-DWQ). Construction activity subject <br /> to this ermifincludes clearing, grading, and disturbances to the round such as stockpiling or <br /> P 9. g 9. 9 P 9 <br /> excavation bait does not include regular maintenance activities performed to restore the original line, <br /> grade, or capacity of the facility. <br /> g. The applicarq.,shall file a Notice of Intent with the State Water Resources Control Board(SWRCB)to <br /> state the inte t to comply with the State General Permit for Storm Water Discharges Associated With <br /> Construction-Activity. The Waste Discharge Identification Number issued by SWRCB shall be <br /> submitted to.Public Works. <br /> h. The applicadshall submit a Storm Water Pollution Prevention Plan (SWPPP)to Public Works for <br /> t Public Works. A co <br /> review. A SWPPP preparation guide is available a py of the SWPPP shall be <br /> maintained ori the construction site and presented to any County, State, or Federal employee on <br /> records u dates test results and <br /> demand, The`SWPPP on the site steall include all required <br /> p , <br /> inspections. <br /> INFORMATIONAL NOTES: <br /> (1) This property is subject to the requirements of the San Joaquin County Mosquito and Vector <br /> Control District(209-982-4675)and the California Health and Safety Code for the prevention of <br /> mosquitos. Best Management Practices guidelines for storm water devices, ponds, and <br /> wetlands are available. <br /> (2) All future,building permits for projects located within a Special Flood Hazard Area at the time of <br /> permit issuance shall meet the San Joaquin County flood hazard reduction requirements (Title 9, <br /> Chapter 9,-1605)and all requirements of the State of California (CCR Title 23)that are in force at <br /> the time of permit issuance. As an example, these requirements may include raising the finish <br /> floor ele\,ation one foot above the expected flood level and/or using flood resistant materials. <br /> Conditions of Approvbl -3 - PA-0900291 <br />