Laserfiche WebLink
• r F <br /> an interim basis, and connection to a public system shall be required when it becomes . <br /> available. (Development Title Section 9-1105.2) <br /> h. Public water service shall be required. (Development Title Section 9-1115.2) <br /> 3. PUBLIC HEALTH SERVICES: <br /> a. Either connect to a public sewer system (Development Title Section 9-1105.2(b) or submit <br /> plans for approval by the Environmental Health Division for a sewage treatment plant for <br /> the entire development until public sewers are available, at which time connection to <br /> public sewers will be required. The plans must be designed by a Registered Engineer. <br /> (Development Title Section 9-1105.2) <br /> b. Obtain discharge requirements from the California Regional Water Quality Control Board, <br /> Central Valley Region, prior to development. (Porter-Cofogne Water Quality Control Act, <br /> Article 5, Section 13280) <br /> C. Connect to an approved public water supply system as required by Development Title <br /> Section 9-1120.2_ Prior to initiation of the use, a letter from the water supplier will be <br /> required which states that they have the capacity to serve the development and that the <br /> system meets State standards. (Development Title Section 9-1100.3) <br /> d. Submit three sets of food facility construction plans to the Environmental Health Division <br /> for review and approval prior to issuance of building permits. (California Health and <br /> Safety Code, Section 27550) <br /> NOTE: On August 11, 1993,the San Joaquin County Community Development Department approved SA- <br /> 93-26 subject to the Conditions of Approval listed above. <br /> E <br /> c <br /> i <br /> 9 <br /> j. Conditions of Approval - 4 - SA-93-25 <br /> i <br />