My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0003122
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
26440
>
2600 - Land Use Program
>
SA-93-26
>
SU0003122
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:29:41 AM
Creation date
9/9/2019 10:38:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0003122
PE
2633
FACILITY_NAME
SA-93-26
STREET_NUMBER
26440
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
RD
City
THORNTON
ENTERED_DATE
11/6/2001 12:00:00 AM
SITE_LOCATION
26440 N THORNTON RD
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\T\THORNTON\26440\SA-93-26\SU0003122\APPL.PDF \MIGRATIONS\T\THORNTON\26440\SA-93-26\SU0003122\CDD OK.PDF \MIGRATIONS\T\THORNTON\26440\SA-93-26\SU0003122\EH COND.PDF \MIGRATIONS\T\THORNTON\26440\SA-93-26\SU0003122\CORRESPOND.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
325
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ROSE ' S Engineering - Geology & Survey Inc <br /> 'i ,I.Th <br /> 9070 Elk Grove Blvd., Elk Grove, CA 95624 (916) 686-5445 <br /> 33 DEC - I PH 2: 19 <br /> November 29, 1993 <br /> Mike Huggins <br /> San Joaquin County <br /> Public Health Division <br /> P.O. Box 2009 <br /> Stockton, CA 95201 <br /> Dear Mr. Huggins: <br /> Enclosed please find a copy of the letter sent to Public Works <br /> requesting their comments on the disposal of the reclaimed water <br /> from the Barnyard project. The two means for disposing of the <br /> reclaimed water are irrigation and either pumping into the <br /> Woodbridge Irrigation Canal or pumping into the county storm drain. <br /> We will need a letter with your comments to present, along with <br /> your letter of 10 May, 1993 to the Planning Division, to Water <br /> Quality, item b in said letter before they will give their <br /> discharge requirements. <br /> Item h of your letter - We will have a floor drain in the plant and <br /> any wash down fluid will be returned to the buffer tanks. <br /> Item i of your letter - We will be drilling a well for the water <br /> supply. Said well will be tied into the existing water line on <br /> Thornton Road. <br /> Should you have any questions, please feel free to call. <br /> Sincerely, <br /> ROSE 'S ENGINEERING-GEOLOGY & SURVEY INC. <br /> Merwin F. Rose, PEG <br /> Al Lind, PE <br /> MFR:jr <br />
The URL can be used to link to this page
Your browser does not support the video tag.