My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0005713
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TURNPIKE
>
3685
>
2600 - Land Use Program
>
PA-0200631
>
SU0005713
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:31:43 AM
Creation date
9/9/2019 10:50:16 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0005713
PE
2611
FACILITY_NAME
PA-0200631
STREET_NUMBER
3685
Direction
S
STREET_NAME
TURNPIKE
STREET_TYPE
RD
City
FRENCH CAMP
APN
17520002 & 03
ENTERED_DATE
10/19/2005 12:00:00 AM
SITE_LOCATION
3685 S TURNPIKE RD
RECEIVED_DATE
12/12/2006 12:00:00 AM
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\T\TURNPIKE\3685\PA-0200631\SU0005713\APPL.PDF \MIGRATIONS\T\TURNPIKE\3685\PA-0200631\SU0005713\CDD OK.PDF \MIGRATIONS\T\TURNPIKE\3685\PA-0200631\SU0005713\EH COND.PDF \MIGRATIONS\T\TURNPIKE\3685\PA-0200631\SU0005713\EH PERM.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NO. �..� <br /> 10:30 a.m. 3. MAJOR SUBDIVISION PRE-APPLICATION NO.PA-0200631 OF <br /> JJ ANTHONY& TERESA NOCETI (C/O WONG ENGINEERS). A <br /> Major Subdivision pre-application for a 25 lot-single-family residential <br /> subdivision. Located on the west terminus of Clayton Avenue, and <br /> Turnpike Road, Stockton (APN: 175-200-02, 3; Address: 3685 S. <br /> Turnpike Road, Stockton). <br /> Jennifer Jolley, Associate Planner;Jim Rose,Jim Rose Construction; Zachary C. Wong; Wong <br /> Engineers Inc.. and Anthony Noceti were present for this item. <br /> Ms.Jolley introduced the project. Ms.Jolley reviewed the Community Development Department <br /> memo. <br /> Mr. Wong asked if the noise study could be deferred and be a condition of the parcel map. <br /> Ms. Jolley indicated no, and informed the applicants that an acoustical study must be prepared <br /> and submitted before the environmental review can be completed. Ms. Jolley indicated that the <br /> Community De-elopment Department needs to be sure that potential noise impacts can be <br /> mitigated. <br /> Ms.Jolley indicated that she has received the"will serve" letter for water. Mr. Wong indicated <br /> that they were %Naiting for a"will serve" letter from the City of Stockton for sewer. <br /> Ms.Jolley questioned potential annexation issues. Mr. Wong informed the Committee that <br /> Mr. Jose Alva%�ill be legal counsel for the project, and that he is waiting to talk to Mr. Alva <br /> regarding these issues. <br /> Mr.Neely reviewed the Public Works Department requirements. <br /> Mr. Borges reviewed the Environmental Health Department requirements. <br /> Mr. Wong questioned the driveway access listed as item 19 in the Public Works Department <br /> memo. Mr. Karam suggested the applicant redesign the driveways with frontage on Clayton <br /> Avenue so that it is unnecessary to back out into traffic. <br /> The meeting was adjourned at 11.05 a.m. C c"/L, <br /> THE DEVELOPMENT COMMITTEE CHANDLER MARTIN <br /> CHAIRMAN <br /> C: Ben Hulse, Director Curt Fujii <br /> Jon Moore,Chief Deputy Director Mike Caprio <br /> Kerry Sullivan, Deputy Director Butch Stefani <br /> Chandler Martin, Senior Planner Kevin Basso <br /> Jim Van Buren, Senior Planner Sangeeta Lewis <br /> Leanne dueller, Associate Planner Mike Hakeem <br /> Jennifer Jolley,Associate Planner Jim Rose <br /> -GabFiel Karam, Public Works Department Zachary Wong <br /> Ben Neely, Public Works Department Anthony Noceti <br /> Ray Borges, Environmental Health Department <br />
The URL can be used to link to this page
Your browser does not support the video tag.