Laserfiche WebLink
h. The development will not result in the degradation or impairment of levee integrity. <br /> This Finding can be made because the project site is not located on or adjacent to <br /> any levee. <br /> i. The development will not adversely impact navigation. <br /> • This Finding can be made because the proposed use is not adjacent to any navigable <br /> waterways. <br /> The development will not result in any increased requirements or restrictions upon agricultural <br /> practices in the Primary Zone. <br /> This Finding can be made because the proposed use will be screened from adjacent <br /> agricultural uses and because those agricultural uses are protected by the County's <br /> Right to Farm Ordinance. <br /> Conditions of Approval <br /> Site Approval Application No. SA-95-6 was approved by the Planning Commission on _. The <br /> effective date of approval is_. This approval will expire on_, which is 18 months from the <br /> effective date of approval, unless (1) all Conditions of Approval have been complied with, (2) all <br /> necessary building permits have been secured and remain in force, and (3) all necessary permits <br /> from other agencies have been secured and remain in force. <br /> Unless otherwise specified, all Conditions of Approval and ordinance requirements shall be fulfilled <br /> prior to the establishment of the use and the issuance of any building permits. Those Conditions <br /> followed by a Section Number have been identified as ordinance requirements pertinent to this <br /> application. Ordinance requirements cannot be modified, and other ordinance requirements may <br /> apply. <br /> 1. COMMUNITY DEVELOPMENT DEPARTMENT: (Staff Contact: Richard Larrouy, 468-3142): <br /> a. APPROVED USE: This approval shall be for the operation of a boat hauling business, <br /> temporary storage of boats that are in-transit or under repair, minor repair of boats <br /> (permitted only within the existing building), and long-term boat storage. There shall be <br /> no retail sales or outdoor marine repair permitted as a part of this approval. This <br /> approval shall limit the number of boats that may be stored on the site to 17 and limit to <br /> 14 days the maximum amount of time that boats in-transit or under repair shall remain on <br /> the property. Permitted marine repairs may only be made by the owner of the property. <br /> All debris and equipment associated with the approved use shall be removed from <br /> adjacent parcels within ten days of the effective date of the application's approval. <br /> b. BUILDING PERMIT. Submit a"Commercial Building Permit Application'for the approved <br /> use. The Site Plan required as a part of the building permit must show site drainage, <br /> driveway access details (including gates), on-site parking, existing and proposed utility <br /> services, landscaping, signs, and grading (refer to the 'SITE PLAN CHECK LIST' for <br /> details). A fee is required for the Site Plan review (Development Title Section 9-884). <br /> San Joaquin County SA-95-6/Coulter <br /> Community Development Page 10 <br />