Laserfiche WebLink
._ w <br /> Mr. Martin asked Mr. Godinho if'the"Health Department would approve on site disposal of <br /> wastewater, and if the Building Department were to say that portable toilets were okay would. <br /> that eliminate the requirement for a soil suitability study/nitrate loading study. Mr. Godinho said- <br /> that <br /> aidthat it would eliminate the perk test.' Mr. Godinho indicated that he would talk to his supervisor, <br /> Mr. Borges, and ask him to contact the Mettlers regarding the testing. <br /> Mr. Godinho and the Mettlers discussed the well requirements. <br /> Mr. Martin reviewed the applicant's request to revise the Use Permit. Mr. Martin indicated that <br /> when the <br /> ,project was referred out the request to delete the soil suitability studylnitrate loading " <br /> study was not included, it was not'part of the project description. -If it is-determined that the <br /> condition can be changed and the'Mettlers want to do so, then the project may need to be <br /> stopped and redo the initial study to include the change-in the project description. Mr. Godinho w1 <br /> asked if we could wait till Monday so he may talk to Mr. Borges and get back to the project <br /> planner. Mr. Martin indicated yes. <br /> Mr.'Martin discussed the drainage issue. Mr. Martin informed the applicants that it.may not be <br /> necessary to have'a registered civil engineer or architect prepare the site plan, and asked the <br /> applicants to check with Mr. Rock in the Building Division. ` <br /> 11:00 a.m. 4.' SITE APPROVAL'APPLICATION NO. SA-01-71 OF ERLINDA <br /> LM HERNANDEZ (CIO SEVERIANO ARROYO). A Site Approval application <br /> to establish auto sales at an existing auto repair facility and a second <br /> phase to add a 480 square foot shop addition. ,There will be 15 cars for <br /> sale-and 15 cars for repair. Located at the isoutfieasf comer of Waterloo <br /> and Golden Gate Avenue, east-of Stockton (APN: 143-130-24; 3012 E. <br /> ' Waterloo Road, Stockton). <br /> Leanne Mueller, Associate Planner; Vicente-Hernandez, owner; Severiano Arroyo; applicant; <br /> 1. <br /> Rick Matuska, Code Enforcement Officer were present for this item..._ <br /> Ms. Mueller introduced the project. <br /> Y . f <br /> Mr. Hernandez indicated that the previous Site,Approval No. SA-98-32-did not expire. Ms. <br /> Mueller informed the'applicant that the research that`she has done indicates that Mr. Hernandez <br /> did not meet all the conditions of approval in the required time frame,tbecause it expired on— <br /> December 21, 1999..Ms. Mueller indicated yes, the wall condition was met but there were other <br /> conditions like the landscaping and striping of the parking spaces that were not. Mr. Hernandez <br /> stated that they were not required in the conditions. Ms..Mueller.stated that they were. W <br /> Mr. Hernandez stated that the fence was built before December of 1999.. Ms.' Mueller agreed r. <br /> Mr. Hernandez indicated that' he spoke with Mr.,Luoma :regarding the landscaping: <• Mr. <br /> Hernandez informed staff that there was a contamination leak'on the property that took about a'; <br /> year to.clean up;and the soil was tested by.the Environmental Health Division. <br /> Mr. Hernandez stated that he is not constructing a building.,Mr. Martin asked if Improvement. <br /> Plans were submitted and approved -for the 'first application. ' Ms' Mueller stated that <br /> Improvement Plans were submitted. Mr. Martin asked if the Improvement Plan was approved:; ; <br /> Ms. Mueller informed Mr. Martin that it was double stamped and Mr. Farano approved it. Me:. <br /> Martin asked if the Business License was issued. Ms. Mueller indicated that there was a <br />