1. COMMUNITY DEVELOPMENT DEPARTMENT (Staff Contact: Mo Hatef, 209-468- <br /> 8477) <br /> a) BUILDING PERMIT: Submit an "APPLICATION-COMMERCIAL BUILDING <br /> PERMIT'. The Site Plan required as a part of the building permit must be prepared <br /> by a registered civil engineer or licensed architect. This Plan must show drainage, <br /> driveway access details including gates, on-site parking, landscaping, signs, <br /> existing and proposed utility services, and grading (refer to the"SITE PLAN CHECK <br /> LIST' for details). A fee is required for the Site Plan review. (Development Title <br /> Section 9-884) <br /> b) APPROVED USE: This approval is °^• aR expansion of an sting wineFy, as <br /> ghO.,.. nn the Rate Plan ^ t molted N,,vembeF 21 is for the expansion of an <br /> existing large winery in five phases over twelve years as shown on the site plan <br /> dated January 13 2012 (Use Type: Wineries and Wine Cellars-Winery. Large). <br /> • Phase One building permits to be issued within eighteen months from the <br /> effective date of approval includes the following: <br /> 1. 2,500 square foot arbor <br /> 2. 1.000 square foot break awning <br /> 3. Upgrade waste water system and management operations of <br /> processed waste water for vineyard irrigation. <br /> • Phase Two, building permits to be issued within three years from the <br /> effective date of approval, includes the following: <br /> 1. 272,941 square foot case goods warehouse <br /> 2. relocate an existing 195 square foot shed <br /> • Phase Three, building permits to be issued within seven years from the <br /> effective date of approval, includes the following: <br /> 1. 281,848 square foot warehouse facility <br /> • Phase Four, building permits to be issued within nine years from the effective <br /> date of approval, includes the following: <br /> 1. 4,000 square foot training/hospitality center <br /> 2. 87 additional parking spaces <br /> • Phase Five, building permits to be issued within twelve years from the <br /> effective date of approval, includes the following: <br /> 1. 13.000 square foot public relations facility <br /> 3 <br />