Laserfiche WebLink
Table 5.1A-6 <br /> NCPA Lodi Energy Center <br /> Calculations for Maximum Hourly, Daily, Quarterly and Annual Criteria Pollutant Emissions <br /> CTG/HRSG Max Possible <br /> Total Hours CTG/HRSG Auxiliary <br /> Hot Start Cold Start Duct Firing Base Load (NOx, CO, Hours Boiler Total <br /> Assumptions for Daily and Annual Ops: Hours Hours Hours Hours VOC) (SO2, PM10) Hours <br /> Daily 0 6 12 6 24 24 12 per day <br /> Q1 100 42 350 1184 1676 2160 142 per quarter <br /> Q2 100 42 350 1208 1700 2184 142 per quarter <br /> Q3 40 36 1100 800 1976 2208 76 per quarter <br /> Q4 72 36 700 1040 1848 2208 108 per quarter <br /> Hourly Emission Rates <br /> NOx Sox CO VOC PM10 NH3 <br /> Equipment max. hour (lbs/hr) (lbs/hr) (lbs/hr) (lbs/hr) (lbs/hr) (lbs/hr) <br /> Gas Turbine, base 0 13.64 5.37 12.46 3.33 9.00 25.25 <br /> Gas Turbine, peak 1 15.25 6.00 13.93 5.32 11.00 28.23 <br /> Gas Turbine, startups/shutdowns 0 100.00 5.37 900.00 16.00 9.00 25.25 <br /> Auxiliary Boiler 1 0.55 0.19 2.37 0.27 0.47 0 <br /> Cooling Tower 1 1 0 0 0 0 0.45 0 <br />