Laserfiche WebLink
• 0 Page 3 of 3 <br /> (WPCF). I believe one of my Staff Geologists, Larry Braybrooks, has had some <br /> initial discussions with you in this regard. <br /> Phase I and IIs have documented some shallow PAH soil impacts and the CEC <br /> has asked DTSC to provide oversight on completion of a PEA at the Site. The <br /> issue is the very aggressive schedule required to begin construction on time. We <br /> just finished compressed negotiations with DTSC on the Voluntary Cleanup <br /> Agreement (VCA) and its schedule. The aggressive schedule became even more <br /> aggressive and DTSC has even agreed to shorten its typical review times for <br /> various steps along the way including allowing a final workplan to be submitted <br /> in lieu of a draft. The workplan, SAP, SSP, and QAPP (over 600 pages) were <br /> submitted to DTSC on Friday 8-14-09. When DTSC sends its approval letter, we <br /> have 42 days to complete the investigation, prepare the PEA, including the risk <br /> assessment. For all the hoopla involved in the project it is a relatively simple <br /> scope of work. Twenty direct push/hand auger borings to 6.5 feet bgs, four <br /> similar background borings, and sampling an existing monitoring well. Depth to <br /> groundwater at the time of investigation will range from 10 12 feet bgs. <br /> My objective with this email is to facilitate as quick a turn around as possible on <br /> receipt of the boring permits. We cannot meet this schedule, if we have to wait a <br /> week for boring permits. In the past SJCEHD has been very cooperative in <br /> facilitating quick turn arounds on certain projects with quick schedules. What I <br /> would propose is that we submit a completed application with all permit, MFR, <br /> and oversight fees, along with a PDF of the Workplan, to start the process. When <br /> we get the approval letter from DTSC, I will email a PDF and follow up with a <br /> hard copy. I would like to discuss this approach with you and determine if you <br /> also need copies of the SAP, SSP, and QAPP, or other information and what <br /> approximate TAT we might expect. This will allow me to move forward with <br /> contracting and scheduling the driller for ASAP after receipt of DTSCs approval <br /> letter and permits from SJCEHD. <br /> Thanks for your cooperation. Please give a call to discuss at your convenience if <br /> necessary. <br /> Gary <br /> Gary D. Haeck, Ph.D., P.G. <br /> Managing Senior Geologist <br /> Sta ntec <br /> 3017 Kilgore Road Suite 100 <br /> Rancho Cordova CA 95670 <br /> Ph: (916)384-0768 <br /> Fx: (916)861-0430 <br /> Cell: (530)400-0362 <br /> Gary.Haeck@Stantec.com <br /> stantec.com <br /> The content of this email is the confidential property of Stantec and should not be copied, modified, <br /> retransmitted, or used for any purpose except with Stantec's written authorization. If you are not the <br /> intended recipient, please delete all copies and notify us immediately. <br /> Please consider the environment before printing this email, <br /> 8/27/2009 <br />