Laserfiche WebLink
CLINT J. HELTON, M.A., RPA <br /> Page 5 <br /> by Sierra Pacific Power Company. Led agency coordination, management of project budget <br /> and staff, assisted with resource data extraction from agency archives. Assisted with <br /> development of MOU, Project Charter, Programmatic Agreement, and public scoping <br /> process. During 14 month construction process, managed team of 25 cultural and biological <br /> resources environmental compliance monitors and acted as point of contact for BLM and <br /> Sierra Pacific Power Company. Contract value was over $2.0 million. Client: Sierra Pacific <br /> Power Company and Bureau of Land Management. Client Contact: Steve Siegel; 775-834- <br /> 4429. <br /> Project Principal and Manager, Army National Guard Cultural Resources Support Contracts; <br /> Utah (2002-2003): Managed sole-sourced cultural resources services from Army National <br /> Guard for all of its 29 facilities within the State of Utah. Primary goal was to assist National <br /> Guard with bringing facilities into compliance with Section 106 of NHPA. Managed <br /> archaeological survey, testing, and data recovery projects. Assisted with Native American <br /> consultation. Authored an Integrated Cultural Resources Management Plan (ICRMP) to assist <br /> the Guard in complying with Department of Defense Instructions 4715.3 and Army Regulation <br /> 200-4. Client: Army National Guard. Client Contact: Army National Guard; Paul Graham, <br /> Environmental Coordinator 801.523.4452 <br /> Program Manager, United States Army Dugway Proving Ground, Cultural and Biological <br /> Resources Services (2001-2002): Program Manager for a 3-year on-call contract to supply <br /> cultural and biological resources services to the United States Army's Dugway Proving Ground. <br /> Served as primary point of contact for the facility's environmental lead official. Assisted facility <br /> staff with cultural resources compliance activities, including cultural resources inventories in <br /> harsh and sometimes dangerous conditions within areas known to contain UXO's and other <br /> potential hazards. Completed required background checks, safety training, range training, <br /> and other required training and preparation to work on the sensitive facility. Led crews on <br /> several large inventories within this expansive training facility in Utah's West Desert. Maintained <br /> constant communication with Range Control and base staff to avoid conflict with range <br /> training activities, while performing the required inventories. Client: Agiess Environmental <br /> (Prime) and Dugway Proving Ground. <br /> Project Manager, United States Army Deseret Chemical Depot, Cultural Resources Services <br /> (2001): As Principal Investigator for a large multi-phased cultural resources investigation of the <br /> United States Army's Deseret Chemical Depot, led initial survey design and sampling plan to <br /> determine the presence, distribution, type, and significance of cultural resources located at <br /> this sensitive chemical weapons facility. Client: CH2MHill (Prime) and Deseret Chemical Depot. <br /> Project Principal/QC Manager, Questar Pipeline Company, Mainline 104 Pipeline Project <br /> (2001): Managed cultural resources component of SWCA's contract to Questar Pipeline <br /> Company in support of the Mainline 104 natural gas pipeline project, 75 miles of 24-inch- <br /> diameter natural gas pipeline from Price to Elberta, Utah, across Carbon, Emery, Sanpete, and <br /> Utah Counties, including the Manti-LaSal and Uinta National Forests, BLM, state, and private <br /> lands. Conducted cultural resources inventory. Responsible for monitoring compliance with <br /> various resources treatment plans and responding to any unanticipated discoveries or <br />