Laserfiche WebLink
Orange County Boy Scout Camp, CA-ORA-534,Orange, <br /> CA. Ms. Lawson served as Crew Chief and directed the <br /> Phase II excavations,including surface collection, shovel test <br /> pits,and 1x1m test units. <br /> Our Lady Queen of Angels,San Juan Capistrano,CA. <br /> Client: Our Lady Queen of Angels School,San Juan <br /> Capistrano,CA. August 2006. Ms. Lawson served as Field <br /> Crew and assisted in the excavation of a burial found during <br /> construction monitoring. <br /> Fagan Canyon Testing Plan,Santa Paula, CA. April 2006. <br /> Client: Centex Homes, Corona, CA. Ms. Lawson served as <br /> Field Director for the CEQA evaluations for two prehistoric <br /> sites. She was responsible for directing field excavations, <br /> including 1x1 m test units,feature excavation, and <br /> mechanical trenching. Ms. Lawson also conducted all <br /> artifact analysis and assisted in the preparation of the final <br /> report. <br /> El Casco Substation, Beaumont, CA.June 2006,July 2006, <br /> and October 2006. Client:Southern California Edison. Ms. <br /> Lawson served as Field Director, directed the Section 106 <br /> survey,and monitored geotechnical testing. <br /> Southern Orange County Transportation Improvement and <br /> Infrastructure Project (SOCTIIP),Orange County, CA. <br /> February 2006. Client: CH2M HILL,Santa Ana, CA. Ms. <br /> Lawson served as Field Crew. She scouted locations for <br /> geotechnical testing and then,monitored the testing within <br /> the preferred alternative of a proposed toll road. <br /> Fagan Canyon Survey,Santa Paula, CA. December 2005. <br /> Client: Centex Homes, Corona, CA. This survey was <br /> conducted over the span of one week. Ms. Lawson served as <br /> Field Crew for the CEQA Phase I survey. <br /> Cultural Resource Assessment of a 20-acre Parcel in <br /> Hesperia,Hesperia, CA. March 2005. Client: George Baum, <br /> Hesperia, CA. Ms. Lawson served as Crew Chief for this 20 <br /> acre CEQA survey. <br /> Trailmark Specific Plan,Romoland, CA. October 2004 and <br /> March 2005 to September 2005. Client: Benchmark Pacific, <br /> Carlsbad, CA. Ms. Lawson served as Field Director for the <br /> CEQA evaluations of four prehistoric sites,two historic <br /> sites, and one combination prehistoric and historic site.She <br />