My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
V
>
VICTOR
>
1220
>
2900 - Site Mitigation Program
>
PR0009056
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2019 9:08:07 AM
Creation date
10/3/2019 8:44:44 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0009056
PE
2960
FACILITY_ID
FA0004059
FACILITY_NAME
LODI DOOR & METAL CO
STREET_NUMBER
1220
STREET_NAME
VICTOR
STREET_TYPE
RD
City
LODI
Zip
95240
CURRENT_STATUS
02
SITE_LOCATION
1220 VICTOR RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J. H. KLEIN FELDER & ASSOCIATES File: W-2001-1 <br /> Overhead/Lodi Door <br /> October 24, 1985 <br /> Page 6 <br /> Task 4 - Pretreatment Design <br /> Plans and specifications will be prepared for designing a <br /> pretreatment system for the painted galvanized steel cleaning and <br /> iron phosphatizing treatment process wastewater. This task will <br /> be initiated concurrently with the facility process evaluation to <br /> effect discontinuence of surface impoundment in the shortest <br /> possible time frame . Construction management and start-up <br /> performance monitoring will be provided to ensure meeting the City <br /> of Lodi ' s pretreatment permit conditions . <br /> Task 5 - Surface Impoundment Assessment —X110 � <br /> Overhead/Lodi Door intends to discontinue use of the surface <br /> impoundment. Before full closure of the surface impoundment is <br /> initiated, an initial Phase I assessment of groundwater beneath <br /> the pond will be conducted. This assessment will provide <br /> information for preparation of a full closure plan . The elements <br /> of this Phase I study are outlined in the following sub-tasks: <br /> Sub-Task 5.1 - Groundwater Monitoring <br /> To assess the surface impoundment impact on groundwater , 3 <br /> monitoring wells will be completed, developed and sampled. Using <br /> information from the RWQCB and DHS, one monitoring well will be <br /> located upgradient with respect to the surface impoundment, and 2 <br /> downgradient. The proposed locations will be reviewed with the <br /> RWQCB and DHS before mobilization. The monitoring wells will be <br />
The URL can be used to link to this page
Your browser does not support the video tag.