Laserfiche WebLink
M. The applicant shall pay a fee to the County of San Joaquin to cover the cost of periodic <br /> inspection of the excavation to ensure compliance with the provisions of the permit and <br /> administration of SMARA requirements (Section 9-2244(s)). <br /> n. A performance guarantee, payable to San Joaquin County and the State Geologist, shall <br /> be required to ensure rehabilitation of the site and compliance with Conditions of <br /> Approval. The estimated cost of rehabilitation shall be reviewed by the Department of <br /> Public Works. The type of guarantee proposed by the applicant must be found <br /> acceptable by the County Counsel. The type of financial guarantee may be, but is not <br /> limited to, the following: <br /> (1). A Surety Bond. <br /> (2). A Trust Fund. <br /> (3). An Irrevocable Letter of Credit. <br /> n. Dikes shall be constructed around areas under excavation outside of the expansion pit. <br /> Water shall be directed by pipe or ditch to and fro the settling ponds. Construction of <br /> dikes shall be subject to approval by the Department of Public works and the State Water <br /> Quality Control Board and shall be designed to prevent erosion, siltation, and water runoff <br /> from the site. <br /> o. A clearance permit shall be required from the Army Corps of Engineers prior to <br /> discharging fill material into drainages, wetlands, or vernal pools. <br /> p. Reclamation for the project shall be in accordance with the Reclamation Plan dated June 5, <br /> 2014. <br /> 2. DEPARTMENT OF PUBLIC WORKS: <br /> Ordinance Requirements: <br /> The Ordinance Requirements listed below have been identified as pertinent to this project. Other <br /> Ordinance Requirements may also apply. Ordinance Requirements cannot be modified. <br /> a. The excavation plan shall be prepared by a Registered Civil Engineer and shall include <br /> the following: <br /> (1). Detail of the access road (the first 100 feet from Waverly Road shall be paved). <br /> (2). A plan of the haul route for County Roads. <br /> (3}. Final grading plan and drainage provision. <br /> (4). Excavation boundaries and quantities of excavation and direction of excavation. <br /> (5). Stockpile area for topsoil. (No excavation or stockpile shall be allowed within 25 <br /> feet of the property boundary or the County right-of-way.) <br /> b. Loads to the Waverly Road shall be restricted to the legal limit. <br /> C. An encroachment permit shall be required for work within the road right-of-way. <br /> d. Public Roads shall be kept free from mud, dirt and gravel resulting from quarry <br /> operations.All on-site haul roads shall be maintained so as to control the dust. <br /> San Joaquin County QX-91-00061Garibald i <br /> Community Development Page 8 <br />