STI Aboveground Storage Tank Report Formal External Inspection COVEY AUTO EXPRESS,Stockton,CA
<br /> Storage Tank Report 1/21/2014 Tank No.1_480 GA Rectangular Used Oil
<br /> Ref: Inspection Goal Methods Employed
<br /> Spool Results
<br /> 9.2011
<br /> 7.1 GENERAL
<br /> 7.1.1 Formal External Certification Name and Number
<br /> Inspection is to be Daniel K. Barber
<br /> performed by STI Certified
<br /> certified inspector Level II AST 8AC 187o9
<br /> 7.1.2 Applicable Check List Horizontal and Vertical cylindrical Single Wall,Steel See Below for each AST
<br /> Horizontal Rectangular Double Wall,steel Photos attached,Test w/
<br /> Containment&Accessories-Visual,Ultrasonic Thickness NDT Systems TG130-DL
<br /> Testing(UTT),History. Ser.No 1105763 C111b.2013
<br /> 7.1.3 Review History Interyiew longtime employees Inspection and Drain Release Discuss with Mike Covey,Jr.
<br /> Records. Truck Shop Management
<br /> 7.1.4A Record AST Locate Plate,-Manufacturer,Date,Design Standard.Serial No. Containment Solutions
<br /> Nameplate Data Capacity,shell thickness,diameter,length Bakersfield,CA 3/zoo7,
<br /> UL P794796 '480"GA,
<br /> 12ga EcoLubeCube
<br /> 8.75'x 3.08'x 3.o'
<br /> 7.1.48 Record Inspection Apply Visual,Ultrasonic&other methods,Photograph and OK
<br /> Findings&Problems Record Findings.
<br /> 7.1.5 Inspect Fabrication Compare to UL,SWI,STI orother industry standards, UL 142 Rectangular
<br /> vs.Industry Standards modifications too inal AST. Double wall
<br /> 7.1.6 Verify Foundation Visual examination for concrete cracking,spallire,washout, Sound,shop Floor
<br /> Integrity voids,settling,slope from AST,standing water,soil contact, Reinforced Concrete
<br /> seepage.
<br /> 7.1.7 Visually Inspect Cracking or spalling,corrosion,anchorage,weld failure or OK
<br /> Sup orts stress,saddle--I-
<br /> 7.1.8 Visually Inspect Visual examination for cracking,spalling,welds,containment, Measure external both
<br /> Secondary penetrations,other containers,basis of volume calculations, shells of steel,double
<br /> Containment,Spill drain valves closed&secured,debris free,& personnel walled cubicle.
<br /> Control&CRD" access. Good personnel access
<br /> 7,1,9A Inspect Ancillary Inspect operability of pumps,valves and piping for stress, Visual OR,No Leakage,
<br /> Equipment-Pumps leakage,fusible links,for corrosion,wiring conduit Integrity. Alemite diaphram
<br /> Fill point containment Camlock connectors pneumatic%-I,Pump&
<br /> Hose
<br /> 7,1.9B Inspect Ancillary Inspect operability of emergency relief&normal venting, Emergency Relief Venting:
<br /> Equipment-Vents continuity of vapor containment. No ERV No normal vent
<br /> relies on fill funnel opening
<br /> 7.1.9C Inspection Ports Interstitial n/a Verify no leakage into secondary interstitial PVC plugs should be metal
<br /> 7.1.9D Inspect Ancillary plastic Gauge float activated
<br /> Equipment-Uquid Pop Up Plastic w/float
<br /> Level
<br /> 7.1.9E Inspect Alarms OverFlll Al arm Only none on secondary interstitial volume No alarm
<br /> 7.1.10 Inspect Bondin nand Refer to NFPA 7805tandards(orinstallatlon of Ughtning Interior,Used Oil AST—N/A
<br /> Grounding,if present Protection Systems.
<br /> 7.1.11 Inspect Stairways, Inspect for broken welds,bent members,corrosion,debris N/A
<br /> Handrails&Platforms free.
<br /> 7.1.12 Inspect Coatings& Exterior of shell,heads,supports and interference with oK
<br /> Labels equipment,Signage.