STATE OF CALIFORNIA
<br />MECHANICAL SYSTEMS t< J,
<br />CEC-NRCC-MCH-01-E (Revised 01116) CALIFORNIA ENERGY COMMISSION
<br />CERTIFICATE OF COMPLIANCE NRCC-MCH-01-E
<br />Mechanical Systems Page 1 of 4
<br />Project Name: 85C Bakery Stockton -Tenant Improvement Date Prepared: 09-20-2018
<br />A. MECHANICAL COMPLIANCE DOCUMENTS & WORKSHEETS (check box if worksheet is included)
<br />For detailed instructions on the use of this and all Energy Efficiency Standards compliance forms, refer to the 2016 Nonresidential Manual
<br />Note: The Enforcement Agency may require all forms to be incorporated onto the building plans.
<br />YES
<br />NO
<br />Comp. Doc./Worksheet #
<br />Title
<br />•
<br />The contractor who installed the equipment is responsible to either conduct the acceptance test themselves or have a qualified entity run the test for them. If more than one person has responsibility
<br />NRCC-MCH-01-E (Part 1 of 3)
<br />Certificate of Compliance, Declaration. Required on plans for all submittals.
<br />•
<br />Inspector - Before occupancy permit is granted all newly installed process systems must be tested to ensure proper operations.
<br />NRCC-MCH-01-E (Part 2 of 3)
<br />Certificate of Compliance, Required Acceptance Tests (MCH -02-A to 11-A). Required on plans for all submittals.
<br />•
<br />MCH -04-A
<br />NRCC-MCH-01-E (Part 3 of 3)
<br />Certificate of Compliance, Required Acceptance Tests (MCH -12-A to 18-A). Required on plans where applicable.
<br />•
<br />MCH -08-A
<br />NRCC-MCH-02-E (Part 1 of 2)
<br />Mechanical Dry Equipment Summary is required for all submittals with Central Air Systems. It is optional on plans.
<br />MCH -11-A
<br />•
<br />NRCC-MCH-02-E (Part 2 of 2)
<br />Mechanical Wet Equipment Summary is required for all submittals with chilled water, hot water or condenser water
<br />systems. It is optional on plans.
<br />•
<br />Automatic FaultDistributed
<br />NRCC-MCH-03-E
<br />Mechanical Ventilation and Reheat is required for all submittals with multiple zone heating and cooling systems. It is
<br />optional on plans.
<br />City/State/Zip:
<br />Dublin / CA / 94568
<br />•
<br />NRCC-MCH-07-E (Part 1 of 2)
<br />Power Consumption of Fans. Required on plans where applicable
<br />N/A
<br />•
<br />NRCC-MCH-07-E (Part 2 of 2)
<br />Power Consumption of Fans, Declaration. Required on plans where applicable
<br />CA Building Energy Efficiency Standards - 2016 Nonresidential Compliance
<br />January 2016
<br />STATE OF CALIFORNIA
<br />MECHANICAL SYSTEMS l a
<br />CEC-NRCC-MCH-01-E (Revised 01116) CALIFORNIA ENERGY COMMISSION
<br />CERTIFICATE OF COMPLIANCE NRCC-MCH-01-E
<br />Mechanical Systems Page 2 of 4
<br />Project Name: 85C Bakery Stockton -Tenant Improvement Date Prepared: 09-20-2018
<br />B. MECHANICAL HVAC ACCEPTANCE FORMS (check box for required compliance documents)
<br />Test Performed By:
<br />Designer:
<br />This compliance document is to be used by the designer and attached to the plans. Listed below are all the acceptance tests for HVAC systems. The designer is required to check the applicable boxes
<br />for all acceptance tests that apply and list all equipment that requires an acceptance test. All equipment of the same type that requires a test, list the equipment description and the number of
<br />systems.
<br />Installing Contractor:
<br />The contractor who installed the equipment is responsible to either conduct the acceptance test themselves or have a qualified entity run the test for them. If more than one person has responsibility
<br />for the acceptance testing, each person shall sign and submit the Certificate of Acceptance applicable to the portion of the construction or installation for which they are responsible.
<br />Enforcement Agency:
<br />Plancheck - The NRCC-MCH-01-E compliance document is not considered a completed document and is not to be accepted by the building department unless the correct boxes are checked.
<br />Inspector - Before occupancy permit is granted all newly installed process systems must be tested to ensure proper operations.
<br />Test Description
<br />MCH -02-A
<br />MCH -03-A
<br />MCH -04-A
<br />MCH -05-A
<br />MCH -06-A
<br />MCH -07-A
<br />MCH -08-A
<br />MCH -09-A
<br />MCH -10-A
<br />MCH -11-A
<br />MCH -18-A
<br />Jia Hui Pan
<br />140.4(c) N/A N/A
<br />Company J
<br />HP Engineering and Design Services Inc.
<br />Automatic FaultDistributed
<br />Address: 3119 Central Parkway
<br />Demand
<br />City/State/Zip:
<br />Dublin / CA / 94568
<br />Phone,
<br />510-468-0613
<br />110.2(e) 3
<br />Hydronic
<br />N/A
<br />Equipment Requiring Testing
<br />Open and Closed Circuit Cooling Towers
<br />Flow Meter with analog output
<br />110.2(e) 4
<br />Single Zone
<br />Air
<br />Economizer
<br />Controlled
<br />Supply Fan
<br />Valve
<br />Supply
<br />System
<br />Automatic
<br />Storage (TES)
<br /># of Units
<br />Outdoor Air
<br />ECMS
<br />Distribution
<br />PRESCRIPTIVE MEASURES
<br />Diagnostics for
<br />140.4(h)2, 140.4(h)5 O Yes G No 0 Yes D No O Yes 0 No
<br />Water
<br />140.4(h)3 N/A N/A
<br />Demand
<br />or Verification
<br />Air -Cooled Chiller Limitations
<br />140.4(j) N/A N/A
<br />Unitary
<br />Variable Flow System Design
<br />Controls
<br />Ventilation
<br />VAV
<br />Leakage Test
<br />140.4(k) N/A N/A
<br />Variable
<br />140.4(k) N/A N/A
<br />VSD on CHW, CW & WLHP Pumps >5HP
<br />Air & Zone
<br />DP Sensor Location
<br />Ducts
<br />RTU -01
<br />1
<br />Temp. Reset
<br />Flow Control
<br />Shed Control
<br />❑
<br />❑
<br />❑
<br />❑
<br />RTU -02
<br />1
<br />(DCV)
<br />❑
<br />❑
<br />❑
<br />❑
<br />❑
<br />RTU -01
<br />1
<br />0
<br />0
<br />171
<br />F1
<br />❑
<br />❑
<br />❑
<br />❑
<br />❑
<br />j
<br />RTU -02
<br />1
<br />❑
<br />❑
<br />❑
<br />❑
<br />❑
<br />❑
<br />❑
<br />❑
<br />❑
<br />Add Row RernibV18 C :sit
<br />CA Building Energy Efficiency Standards - 2016 Nonresidential Compliance
<br />0
<br />Lu
<br />Lu
<br />U)
<br />W
<br />of
<br />U)
<br />c�
<br />it
<br />J
<br />J
<br />Q
<br />STATE OF CALIFORNIA
<br />MECHANICAL SYSTEMS
<br />CEC-NRCC-MCH-01-E (Revised 01116)
<br />CALIFORNIA ENERGY COMMISSION
<br />CERTIFICATE OF COMPLIANCE NRCC-MCH-01-E
<br />Mechanical Systems Page 3 of 4
<br />Project Name: 85C Bakery Stockton -Tenant Improvement Date Prepared: 09-20-2018
<br />Documentation Author Signature:
<br />C. MECHANICAL HVAC ACCEPTANCE FORMS (check box for required compliance documents)
<br />Test Performed By:
<br />Designer:
<br />This compliance document is to be used b the designer and attached to the plans. Listed below are all the acceptance tests for HVAC systems. The designer is required to check the applicable boxes
<br />p Y g p p Y g q
<br />for all acceptance tests that apply and list all equipment that requires an acceptance test. All equipment of the same type that requires a test, list the equipment description and the number of
<br />systems.
<br />Installing Contractor:
<br />The contractor who installed the equipment is responsible to either conduct the acceptance test themselves or have a qualified entity run the test for them. If more than one person has responsibility
<br />for the acceptance testing, each person shall s.ign.and submit the Certificate of Acceptance applicable to the portion of the construction or installation for which they are responsible.
<br />Enforcement Agency:
<br />Plancheck - The NRCC-MCH-01-E compliance document is not considered a completed document and is not to be accepted by the building department unless the correct boxes are checked.
<br />Inspector - Before occupancy permit is granted all newly installed process systems must be tested to ensure proper operations.
<br />Test Description
<br />MCH -12-A
<br />MCH -13-A
<br />MCH -14-A
<br />MCH -15-A
<br />MCH -16-A
<br />MCH -17-A
<br />MCH -18-A
<br />Jia Hui Pan
<br />140.4(c) N/A N/A
<br />Company J
<br />HP Engineering and Design Services Inc.
<br />Automatic FaultDistributed
<br />Address: 3119 Central Parkway
<br />License M35374
<br />City/State/Zip:
<br />Dublin / CA / 94568
<br />Phone,
<br />510-468-0613
<br />110.2(e) 3
<br />N/A
<br />N/A
<br />Fault Detection
<br />Open and Closed Circuit Cooling Towers
<br />Flow Meter with analog output
<br />110.2(e) 4
<br />Thermal Energy
<br />Supply Air
<br />Condenser
<br />Open and Closed Circuit Cooling Towers
<br />Overflow Alarm
<br />Equipment Requiring Testing or
<br /># of Units
<br />&Diagnostics
<br />Detection &
<br />Energy Storage
<br />Storage (TES)
<br />Temperature
<br />Water Reset
<br />ECMS
<br />Verification
<br />PRESCRIPTIVE MEASURES
<br />Diagnostics for
<br />140.4(h)2, 140.4(h)5 O Yes G No 0 Yes D No O Yes 0 No
<br />Cooling Tower Flow Controls
<br />140.4(h)3 N/A N/A
<br />Centrifugal Fan CoolingTowers4
<br />140.4(h)4 N/A N/A
<br />Air -Cooled Chiller Limitations
<br />140.4(j) N/A N/A
<br />for DX Units
<br />Variable Flow System Design
<br />DX AC Systems
<br />Systems
<br />Reset Controls
<br />Controls
<br />140.4(k) N/A N/A
<br />WLHP Isolation Valves
<br />140.4(k) N/A N/A
<br />VSD on CHW, CW & WLHP Pumps >5HP
<br />Air & Zone
<br />DP Sensor Location
<br />RTU -01
<br />1
<br />❑
<br />❑
<br />❑
<br />❑
<br />❑
<br />❑
<br />❑
<br />RTU -02
<br />1
<br />❑
<br />❑
<br />❑
<br />❑
<br />❑
<br />❑
<br />❑
<br />Add Row Remove Last
<br />CA Building Energy Efficiency Standards - 2016 Nonresidential Compliance
<br />January 2016
<br />STATE OF CALIFORNIA
<br />MECHANICAL SYSTEMS ►' 1,
<br />CEC-NRCC-MCH-01-E (Revised 01116) CALIFORNIA ENERGY COMMISSION
<br />CERTIFICATE OF COMPLIANCE NRCC-MCH-01-E
<br />Mechanical Systems Page 4 of 4
<br />Project Name: 85C Bakery Stockton -Tenant Improvement Date Prepared: 09-20-2018
<br />DOCUMENTATION AUTHOR'S DECLARATION STATEMENT
<br />1. 1 certify that this Certificate of Compliance documentation is accurate and complete.
<br />Docum entadon Author Name Jia Hui Pan
<br />Documentation Author Signature:
<br />Company:
<br />JHP Engineering and Design Services Inc.
<br />Signature Date:
<br />09-20-2018
<br />Address3119 Central Parkway
<br />CEA/ HERS Certification Identification (ifapplicable):
<br />City/State/Zip:
<br />Dublin / CA/ 94568
<br />Phone:
<br />510-468-0613
<br />RESPONSIBLE PERSON'S DECLARATION STATEMENT
<br />I certify the following under penalty of perjury, under the laws of the State of California:
<br />1. The information provided on this Certificate of Compliance is true and correct.
<br />2. 1 am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design identified on this Certificate of Compliance (responsible
<br />designer).
<br />3. The energy features and performance specifications, materials, components, and manufactured devices for the building design or system design identified on this Certificate of Compliance
<br />conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations.
<br />4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents,
<br />worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application.
<br />5. 1 will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s) issued for the building, and made available to the enforcement
<br />agency for all applicable inspections. I understand that a completed signed copy of this Certificate of Compliance is required to be included with the documentation the builder provides to the
<br />building owner at occupancy.
<br />Responsible Designer Name:
<br />Responsible Designer Signature:
<br />Jia Hui Pan
<br />140.4(c) N/A N/A
<br />Company J
<br />HP Engineering and Design Services Inc.
<br />Date Signed:
<br />09-20-2018
<br />Address: 3119 Central Parkway
<br />License M35374
<br />City/State/Zip:
<br />Dublin / CA / 94568
<br />Phone,
<br />510-468-0613
<br />January 2016 I I ICA Building Energy Efficiency Standards - 2016 Nonresidential Compliance
<br />January 2016
<br />STATE OF CALIFORNIA
<br />HVAC DRY & WET SYSTEM REQUIREMENTS ,
<br />:EC-NRCC-MCH-02-E (Revised 01116) CALIFORNIA ENERGY COMMISSION
<br />CERTIFICATE OF COMPLIANCE NRCC-MCH-02-E
<br />HVAC Dry System Requirements (Page 1 of 3)
<br />Project Name. 85C Bakery Stockton - Tenant Improvement Date Prepared: 09-20-2018
<br />A. Equipment Tags and System Description'-
<br />Dry Systems
<br />RTU -01
<br />I RTU -02
<br />MANDATORY MEASURES
<br />MANDATORY MEASURES
<br />Heating Equipment Efficiency3
<br />Cooling Equipment Efficiency3
<br />HVAC or Heat Pump Thermostats
<br />Furnace Standby Loss Control
<br />Low Leakage AHUs
<br />Ventilation
<br />Demand Control Ventilations
<br />Occupant Sensor Ventilation Contro16
<br />Shutoff and Reset Controls'
<br />Outdoor Air and Exhaust Damper Control
<br />Isolation Zones
<br />Automatic Demand Shed Controls
<br />Economizer FDD
<br />Duct Insulation
<br />PRESCRIPTIVE MEASURES
<br />Equipment is sized in conformance with
<br />140.4 (a & b)
<br />Supply Fan Pressure Control
<br />Simultaneous Heat/Cool$
<br />Economizer
<br />Heat and Cool Air Supply Reset
<br />Electric Resistance Heatind
<br />Duct Leakage Sealing and Testing.10
<br />Reference to the Requirements in the Contract Documents
<br />T-24 Sections
<br />Reference to the Requirements in the Contract Documents
<br />110.1 or 110.2(x) ME -0.2 ME -0.2
<br />110.1 or 110.2(x) ME -0.2 ME -0.2
<br />110.2(b), 110.2(c) ME-0.2/ME-1.0 ME-0.2/ME-1.0
<br />110.2(d) N/A N/A
<br />110.2(f) N/A N/A
<br />120.1(b) ME -0.2 ME -0.2
<br />120.1(c)4 N/A N/A
<br />120.1(c)5, 120.2(e)3 N/A N/A
<br />120.2(e) ME -0.2 ME -0.2
<br />120.2(f) ME -0.2 ME -0.2
<br />120.2(g) N/A N/A
<br />120.2(h) N/A N/A
<br />120.2(i) NOT REQUIRED NOT REQUIRED
<br />120.4 ME -0.2 ME -0.2
<br />N/A
<br />140.4(a & b) O Yes 0 No 0 Yes 0 No 0 Yes 0 No
<br />140.4(c) N/A N/A
<br />140.4(d) N/A N/A
<br />140.4(e) NOT REQUIRED NOT REQUIRED
<br />140.4(f) ME -0.2 ME -0.2
<br />140.4(g) N/A N/A
<br />140.4(1) N/A N/A
<br />Notes:
<br />1. Provide equipment tags (e. g. AHUI to 10) and system description (e. g. Single Duct VA reheat) as appropriate. Multiple units
<br />with common requirements can be grouped together.
<br />2. Provide references to plans (i. e. Drawing Sheet Numbers) and/or specifications (including Section name/number and relevant
<br />paragraphs) where each requirement is specified Enter "N/A" if the requirement is not applicable to this system.
<br />3. The referenced plans and specifications must include ail of the following information: equipment tag, equipment nominal
<br />capacity, Title 24 minimum efficiency requirements, and actual rated equipment efficiencies. Where multiple efficiency
<br />requirements are applicable (e.g. full- and part -load) include all Where appliance standards apply (110.1),. identify where
<br />equipment is required to be listed per Title 201601 et seq.
<br />4. Identify where the ventilation requirements are documented for each central HVAC system. Include references to both central
<br />unit schedules and sequences of operation. If one or more spaces is naturally ventilated identify where this is documented in
<br />the plans and specifications. Multiple zone central air systems must also provide a MCH -03-E compliance document.
<br />S. If one or more spaces has demand controlled ventilation identify where it is specified including the sensor specifications and the
<br />sequence of operation.
<br />6. If one or more space has occupant sensor ventilation control identify where it is specified including the sensor specifications and
<br />the sequence of operation
<br />7. If the system is DDC identify the sequences for the system start/stop, optimal start, setback (if required) and setup (if required).
<br />For all systems identify the specification for the thermostats and time clocks (if applicable).
<br />S. Identify where the heating, cooling and deadband airflows are scheduled for this system. Include a reference to the
<br />specification of the zone controls. Provide a MCH -03-E compliance document.
<br />9. Enter N/A if there is no electric heating. If the system has electric heating indicate which exception to 140.4(g) applies.
<br />10. If duct leakage sealing and testing is required, a MCH -04-A compliance document must be submitted.
<br />CA Buil ding Energy Efficiency Standards - 2016 Nonresidential Compliance
<br />January 2016
<br />STATE OF CALIFORNIA
<br />HVAC DRY & WET SYSTEM REQUIREMENTS
<br />CEC-NRCC-MCH-02-E (Revised 01/16) CALIFORNIA ENERGY COMMISSION
<br />CERTIFICATE OF COMPLIANCE NRCC-MCH-02-E
<br />HVAC Dry & Wet System Requirements (Page 2 of 3)
<br />Pro'ect Name. : Date Prepared: 85CBakery Stockton -Tenant Improvement p 09-20-2018
<br />-
<br />B. Equipment Ta sand System Description'- Wet Systems g Y P Y
<br />RTU -01
<br />RTU -02
<br />MANDATORY MEASURES
<br />T-24 Sections
<br />Reference to the Requirements in the Contract Documents
<br />Heating Hot Water Equipment Efficiency3
<br />110.1
<br />N/A
<br />N/A
<br />I--
<br />110.1, 140.4(i)
<br />N/A
<br />N/A
<br />o
<br />Cooling Chilled and Condenser Water
<br />Equipment Efficiency
<br />110.2(e) 1
<br />N/A
<br />N/A
<br />Open and Closed Circuit Cooling Towers
<br />conductivity or flow -based controls
<br />110.2(e) 2
<br />N/A
<br />N/A
<br />O
<br />Open and Closed Circuit Cooling Towers
<br />Maximum Achievable Cycles of
<br />Concentration (LS 1)6
<br />M
<br />�
<br />z
<br />U
<br />110.2(e) 3
<br />N/A
<br />N/A
<br />Open and Closed Circuit Cooling Towers
<br />Flow Meter with analog output
<br />110.2(e) 4
<br />N/A
<br />N/A
<br />Open and Closed Circuit Cooling Towers
<br />Overflow Alarm
<br />110.2(e) 5
<br />N/A
<br />N/A
<br />Open and Closed Circuit Cooling Towers
<br />Efficient Drift Eliminators
<br />Pipe Insulation
<br />120.3
<br />N/A
<br />N/A
<br />PRESCRIPTIVE MEASURES
<br />Cooling Tower Fan Controls
<br />140.4(h)2, 140.4(h)5 O Yes G No 0 Yes D No O Yes 0 No
<br />Cooling Tower Flow Controls
<br />140.4(h)3 N/A N/A
<br />Centrifugal Fan CoolingTowers4
<br />140.4(h)4 N/A N/A
<br />Air -Cooled Chiller Limitations
<br />140.4(j) N/A N/A
<br />140.4(k) N/A N/A
<br />Variable Flow System Design
<br />140.4(k) N/A N/A
<br />Chiller and Boiler Isolation
<br />140.4(k) N/A N/A
<br />CHW and HHW Reset Controls
<br />140.4(k) N/A N/A
<br />WLHP Isolation Valves
<br />140.4(k) N/A N/A
<br />VSD on CHW, CW & WLHP Pumps >5HP
<br />140.4(k) N/A N/A
<br />DP Sensor Location
<br />Notes:
<br />1. Provide equipment tags (e.g. CH 1 to 3) or system description (e.g. CHW loop) as appropriate. Multiple units with common
<br />requirements can be grouped together.
<br />2. Provide references to plans (i.e. Drawing Sheet Numbers) and/or specifications (including Section name/number and relevant
<br />paragraphs) where each requirement is specified. Enter "N/A" if the requirement is not applicable to this system.
<br />3. The referenced plans and specifications must include all of the following information: equipment tag, equipment nominal
<br />capacity, Title 24 minimum efficiency requirements, and actual rated equipment efficiencies. Where multiple efficiency
<br />requirements are applicable (e.g. full- and part -load) include all. For chillers operating at non-standard efficiencies provide
<br />the Kadj values. For chillers also note whether the efficiencies are Path A or Path B.
<br />4. identify if cooling towers have propeller fans. if towers use centrifugal fans document which exception is used.
<br />5. if air-cooled chillers are used, document which exceptions have been used to comply with 140.4(j) and the total installed design
<br />capacity of the air-cooled chillers in the chilled water plant.
<br />6. Identify the existence of a completed MCH -06-E when open or closed circuit cooling towers are specified to be installed,
<br />otherwise enter "N/A".
<br />CA Building Energy Efficiency Standards - 2016 Nonresidential Compliance January 2016
<br />Hrp7 JP
<br />P
<br />EJJJ
<br />J - e- rl 3, 7 JJJ
<br />,n I Desi n,
<br />e�rwcJes� IrJJCJ�
<br />ADR: 3119 Central Parkway,
<br />Dublin CA. 94568
<br />TEL: 510-788-6029
<br />CEL: 510-468-0613
<br />FAX: 510-788-6039
<br />Revisions Date
<br />PROGRESS REVIEW 10-01-2018
<br />PERMIT SET 10-29-2018
<br />Preliminary Set
<br />Design Review Set
<br />Plan Check Set X
<br />Plan Check Resubmit
<br />Construction Set
<br />Z
<br />O
<br />FMY
<br />V
<br />O
<br />FM
<br />U)
<br />1
<br />>11111M
<br />U)
<br />LUZ
<br />C)
<br />I--
<br />LU
<br />J
<br />o
<br />L0
<br />LU
<br />O
<br />Q
<br />O
<br />Q
<br />M
<br />�
<br />z
<br />U
<br />Qz
<br />°
<br />V
<br />z
<br />m
<br />Q
<br />U
<br />LU
<br />Ln
<br />0
<br />w
<br />F---
<br />00
<br />U)
<br />Scale: AS NOTED
<br />Drawn By: AL
<br />Approved By: JP
<br />Job: 18033
<br />Sheet:
<br />MECHANICAL
<br />PRESCRIPTIVE TITLE
<br />24 COMPLIANCE
<br />of: ME -0.4
<br />
|