My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
878
>
1600 - Food Program
>
PR0544919
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2021 10:00:40 AM
Creation date
10/18/2019 4:28:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0544919
PE
1623
FACILITY_ID
FA0025535
FACILITY_NAME
85C BAKERY CAFE
STREET_NUMBER
878
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
CURRENT_STATUS
01
SITE_LOCATION
878 BENJAMIN HOLT DR
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\jcastaneda
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />Lu <br />Lu <br />U) <br />Lu <br />ry <br />it <br />J <br />J <br />Q <br />U <br />z <br />U <br />Lu <br />U <br />ry <br />Lu <br />U) <br />z <br />c� <br />w <br />0 <br />0 <br />z <br />Q <br />z <br />ry <br />Lu <br />Lu <br />z <br />z <br />Lu <br />i <br />II <br />MA \ <br />O 1 1 <br />077 -LB <br />M <br />A <br />2,16 <br />I - <br />0 <br />110 <br />FLOW CALCULATIONS: <br />TOTAL VENTILATION OSA BY RTUs: <br />MIN. EXHAUST BY RTUs: <br />TOTAL UNCONDITIONED KITCHEN <br />TOTAL KITCHEN HOOD EXHAUST: <br />TOTAL RESTROOM EXHAUST: <br />MAKE-UP <br />O <br />BUILDING AIRFLOW BALANCE CHECK: 0 CFM <br />ROOF MECHANICAL PLAN <br />SCALE: 114" = 1 '-0" <br />N <br />SHEET NOTES: <br />1> KITCHEN MAKE-UP AIR UNIT (MAU-01) FOR <br />TYPE -II KITCHEN EXHAUST HOOD. INSTALL UNIT <br />TO MAINTAIN ALL MANUFACTURE CLEARANCE <br />REQUIREMENTS. COORDINATE WITH PLUMBING <br />CONTRACTOR FOR COLD WATER PROVISIONS. SEE <br />SCHEDULE FOR EQUIPMENT DETAIL. ALSO SEE <br />ME -0.3 FOR MOUNTING DETAIL. <br />J MAINTAIN MIN. 10'-0" CLEARANCE FROM E�����e'e�r�� <br />MECHANICAL OUTSIDE AIR INTAKE TO BUILDING a����� Vie` n <br />EXHAUST AND PLUMBING VENT.e�rmr1crm Irn1 rm <br />�� <br />NEW PACKAGED ROOFTOP AC UNIT INSTALLED ON ADR <br />EXISTING ROOF CURB WITH NEW CURB ADOPTER . TEL: <br />CONTRACTOR SHALL MEASURE EXACT DIMENSIONS FAX: <br />OF CURB AND CONFIRM WITH EQUIPMENT REP. <br />FOR CORRECT CURB ADOPTER. SEE EQUIPMENT <br />SCHEDULE FOR FURTHER DETAILED REQUIREMENTS <br />NEW TYPE -II KITCHEN EXHAUST FAN MOUNTED <br />ON FACTORY VENTILATED ROOF CURB WITH <br />EXTENSION AND HINGE ACCESS. SEE EQUIPMENT <br />SCHEDULE FOR DETAIL. ALSO SEE ME -0.3 FOR <br />EXHAUST FAN MOUNTING DETAIL. <br />DISCHARGE OF KITCHEN EXHAUST SHALL BE <br />DISCHARGED AWAY FROM ROOF SURFACE AND <br />SHALL AT MIN. 3'-6" ABOVE ROOF SURFACE. <br />16"0 TYPE -II KITCHEN EXHAUST DUCT UP FROM <br />BELOW. SEE DETAIL FOR ROOF FOR PENETRATION. <br />18"0 MA UP FROM BELOW AND CONNECT TO <br />DISCHARGE OF MAKE-UP AIR UNIT WITH SMOOTH <br />TRANSITION AND FLEXIBLE CONNECTION. <br />COORDINATE WITH GC FOR PROVISION OF ROOF <br />CURB FOR MAKE-UP AIR UNIT. <br />8"0 RESTROOM EXHAUST UP THRU ROOF AND <br />TERMINATED WITH LISTED WEATHER HOOD. <br />5"0 TYPE B DOUBLE WALL WATER HEATER FLUE <br />UP FROM BELOW. WATER FLUE SHALL BE <br />TERMINATE WITH LISTED FACTORY WEATHER CAP <br />AT 24" ABOVE ANY SURFACE WITHIN 10' RADIUS <br />WALK-IN FREEZER CONDENSING UNIT BY <br />EQUIPMENT REP. SHOWN FOR REFERENCE ONLY. <br />G.C. TO COORDINATE WITH REP. AND PROVIDE <br />ROOF CURB FOR EQUIPMENT MOUNTING. <br />WALK-IN COOLER CONDENSING UNIT BY <br />EQUIPMENT REP. SHOWN FOR REFERENCE ONLY. <br />G.C. TO COORDINATE WITH REP. AND PROVIDE <br />ROOF CURB FOR EQUIPMENT MOUNTING. <br />REFRIGERANT LINES FOR WALK-IN FREEZER AND <br />COOLER BY KITCHEN EQUIPMENT VENDOR. SHOWN <br />FOR REFERENCE. PROVIDE SUPPORTS FOR RF <br />PIPES AT 6' O.C. ON ROOF. <br />PROVIDE WEATHERPROOF HOOD FOR PIPE THRU <br />ROOF PENETRATIONS. SEE PB -0.3 FOR DETAIL. <br />1.5 -TON CONDENSING UNIT OF SPLIT -AC <br />SYSTEM. SEE EQUIPMENT SCHEDULE FOR <br />FURTHER DETAILS. <br />Y2"O REFRIGERANT GAS AND Y4"0 REFRIGERANT <br />LIQUID WITH ARMACELL INSULATION AND <br />ALUMINUM JACKETING DN. TO FC -01. PROVIDE <br />SUPPORTS FOR RF PIPES AT 6' O.C. ON ROOF. <br />ICE MACHINE CONDENSING UNIT BY EQUIPMENT <br />REP. SHOWN FOR REFERENCE ONLY. G.C. TO <br />COORDINATE WITH REP. AND PROVIDE ROOF <br />CURB FOR EQUIPMENT MOUNTING. <br />REFRIGERANT LINES FOR ICE MACHINE BY <br />KITCHEN EQUIPMENT VENDOR. SHOWN FOR <br />REFERENCE. PROVIDE SUPPORTS FOR RF PIPES <br />AT 6' O.C. ON ROOF. <br />3119 Central Parkway, <br />Dublin CA. 94568 <br />510-788-6029 <br />510-468-0613 <br />510-788-6039 <br />I Revisions I Date I <br />PROGRESS REVIEW 10-01-2018 <br />PERMIT SET 10-29-2018 <br />Preliminary Set <br />Design Review Set <br />Plan Check Set X <br />Plan Check Resubmit <br />Construction Set <br />1 <br />Scale: AS NOTED <br />Drawn By: AL <br />Approved By: JP <br />Job: 18033 <br />Sheet: <br />ROOF <br />MECHANICAL PLAN <br />of: ME -2.0 <br />Cn <br />LUZ <br />p <br />ti <br />w <br />o <br />Lo <br />LLJ <br />Q <br />O <br />= <br />Q <br />M <br />� <br />? <br />U <br />QZ <br />0 <br />V <br />F- <br />z ° <br />O <br />Q <br />m <br />U <br />w`{' <br />0 <br />00 <br />F ---o <br />cn <br />Scale: AS NOTED <br />Drawn By: AL <br />Approved By: JP <br />Job: 18033 <br />Sheet: <br />ROOF <br />MECHANICAL PLAN <br />of: ME -2.0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.