Of
<br />0
<br />Z
<br />Q
<br />c�
<br />Z
<br />iY
<br />Lu
<br />Lu
<br />Z
<br />0
<br />Z
<br />Lu
<br />GENERAL NOTES
<br />PLUMBING GENERAL NOTES
<br />PLUMBING GENERAL NOTES CON'T.
<br />LEGENDS, SYMBOLS AND ABBREVIATIONS
<br />1.
<br />CONTRACTOR SHALL VISIT JOB SITE, VERIFY FIELD CONDITIONS, REVIEW
<br />14.
<br />PIPING SHALL BE NEW AND FREE FROM FOREIGN SUBSTANCES. REAM
<br />36. SANITARY AND GREASE DRAINAGE PIPING AND FITTING:
<br />SYMBOL DESCRIPTION
<br />7
<br />PLAN AND SPECIFICATIONS AND SHALL INCLUDE IN HIS PRICE THE
<br />OUT ALL BURRS FORMED IN CUTTING PIPE. THREADS SHALL BE CUT
<br />NECESSARY COST TO CONSTRUCT THIS PROJECT IN ACCORDANCE WITH THE
<br />ACCURATELY AND NOT OVER TWO THREADS SHALL SHOW BEYOND THE
<br />A. CAST IRON SOIL PIPE AND FITTINGS (ABOVE FLOOR): REQUIRED
<br />MECHANICAL DRAWING AND SHALL MEET ALL APPLICABLE CODES.
<br />FITTING. FRICTION WRENCHES SHALL BE USED WITH PLATED POLISHED,
<br />CISPI 301 & 310 WHICH COMPLIANCE WITH HUD UM 77A CAST IRON
<br />UP EQUIPMENT TYPE
<br />OR SOFT METAL PIPING.
<br />HUBLESS SOIL PIPE AND FITTING. ALL PIPE AND FITTINGS SHALL BE
<br />LO EQUIPMENT NUMBER
<br />2.
<br />ALL MATERIAL AND EQUIPMENT FURNISHED AND INSTALLED SHALL BE NEW,
<br />MARKED WITH CISPI'S COLLECTIVE TRADEMARK OR RECEIVE PRIOR
<br />DETAIL DRAWING NUMBER
<br />� r�
<br />JHP
<br />FREE FROM DEFECTS AND SHALL BE GUARANTEED FOR A PERIOD OF ONE
<br />15.
<br />CHANGES IN PIPE SIZE SHALL BE MADE WITH REDUCING FITTINGS, AND
<br />APPROVAL BE THE ENGINEER OF RECORD. JOINTS FOR HUBLESS PIPE
<br />M-� DETAIL DRAWING PAGE
<br />Ez'L� PP
<br />►gl
<br />YEAR FROM DATE OF FINAL ACCEPTANCE BY THE OWNER. SHOULD ANY
<br />BUSHING WILL NOT BE PERMITTED.
<br />AND FITTINGS: CISPI 310 AND SHALL CONFORM TO THE
<br />�� ■1-7
<br />JJ J'J`J�JJJ
<br />TROUBLE DEVELOP DURING THE PERIOD DUE TO FAULTY WORKMANSHIP OR
<br />MANUFACTURERS INSTALLATION INSTRUCTIONS AND LOCAL CODE
<br />�� POC POINT OF CONNECTION
<br />aJJJ-� �e'a1�J
<br />MATERIAL, THE CONTRACTOR SHALL FURNISH ALL NECESSARY MATERIAL
<br />16.
<br />UNION CONNECTION SHALL BE INSTALLED DOWNSTREAM OF ALL VALVES,
<br />SJgr�V1Cye�Sj Irn-1 rm
<br />AND LABOR TO CORRECT THE TROUBLE WITHOUT COST TO THE OWNER.
<br />AT ALL EQUIPMENT CONNECTIONS AND AT OTHER POINTS AS REQUIRED.
<br />REQUIREMENTS. ANACO HUSKY SD 4000, CLAMP-ALL 125, TYLER
<br />�� POD POINT OF DISCONNECT
<br />WB, MG COUPLINGS, OR EQUAL, COMPLY WITH FM 1680, CLASS 1.
<br />ADR: 3119 Central Parkway,
<br />3.
<br />CONTRACTOR IS TO REVIEW THE PLANS OF OTHER DISCIPLINES AND
<br />17.
<br />CUTTING OR BORING OF HOLES THROUGH STRUCTURAL MEMBERS SHALL
<br />B. CAST IRON SOIL PIPE AND FITTINGS (BELOW SLAB): ASTM A74
<br />' -- PLUMBING FIXTURE CONNECTION
<br />TEL: 551011788 6 249568
<br />COORDINATE WITH THE WORK OF OTHER TRADES PRIOR TO INSTALLATION
<br />BE DONE ONLY WHEN IT IS IMPOSSIBLE TO ROUTE PIPING IN ANOTHER
<br />STANDARD WEIGHT HUB AND SPIGOT PIPING AND FITTING. ALL PIPE
<br />= CO CLEAN OUT
<br />CEL: 510-468-0613
<br />FAX: 510-788-6039
<br />TO AVOID ANY CONFLICT BETWEEN DUCTS, CONDUITS, SPRINKLERS, PIPING,
<br />MANNER. IF CUTTING OR BORING IS NECESSARY IT SHALL BE
<br />AND FITTINGS SHALL BE MARKED WITH CISPI'S COLLECTIVE
<br />LIGHTING FIXTURES, ETC. NO EXTRAS WILL BE ALLOWED FOR CORRECTION
<br />ACCOMPLISHED ONLY BY WRITTEN APPROVAL FROM THE ARCHITECT,
<br />TRADEMARK OR RECEIVE PRIOR APPROVAL BE THE ENGINEER OF
<br />DN. PIPE DOWN
<br />RpFESS/0
<br />OF CONFLICTS DUE TO LACK OF COORDINATION.
<br />STRUCTURAL AND BUILDING ENGINEER, AND ALSO INCLUDED IN HIS BIDS
<br />RECORD. JOINT FOR HUB AND SPIGOT PIPE AND FITTINGS: ASTM
<br />0- UP PIPE UP
<br />roe Nu
<br />WORK SHALL COMPLY WITH CBC SECTIONS 2320A.8.3 AND 2320A.11.10.
<br />C-564 COMPRESSION GASKETS OR SHALL BE INSTALLED WITH LEAD
<br />> -- FLOW DIRECTION
<br />4.
<br />THE DRAWINGS ARE DIAGRAMMATIC AND SHALL NOT BE SCALED TO
<br />AND OAKUM.
<br />M3
<br />DETERMINE EXACT LOCATION OF PIPING, DUCT WORK OR DIFFUSERS.
<br />18.
<br />DO NOT ALLOW THE PIPING, VALVES OR CONNECTORS TO FORM A RIGID
<br />C. COPPER DRAINAGE PIPING AND FITTINGS (ABOVE FLOOR): ASTM
<br />J TP TRAP PRIMER W/ WALL ACCESS PANEL
<br />E=H_.,6/31/19
<br />CONNECTION WITH THE STRUCTURE OR OTHER PIPES. INSTALL PIPING TO
<br />COPPER AND B16.23 CAST BRONZE
<br />SOV SHUT-OFF VALVE
<br />5.
<br />THE CONTRACTOR SHALL BRING TO THE ARCHITECTS ATTENTION OF ANY
<br />ALLOW FOR EXPANSION AND CONTRACTION WITHOUT STRESSING PIPE,
<br />SOLDER-JOINT OINTPE
<br />DRAINAGE TYPEG
<br />FITTING. MISSION, OR
<br />N CKV CHECK VALVE
<br />q
<br />°
<br />DISCREPANCY OR CONFLICTS IN THE PLANS OR THE SITE CONDITIONS. ALL
<br />JOINTS OR CONNECTED EQUIPMENT.
<br />EQUAL, CISPI 310 ADAPTOR COUPLING WITH NEOPRENE GASKET AND
<br />NECESSARY CHANGES MUST BE APPROVED IN WRITING BY THE ARCHITECT
<br />STAINLESS STEEL SHIELD WITH TWO BANDS.
<br />r�i GCK GAS COCK
<br />BEFORE START OR WORK.
<br />19.
<br />PROVIDE SIOUX CHIEF WATER HAMMER ARRESTER FOR EACH PLUMBING
<br />D. CONDENSATE PIPING AND FITTINGS: ASTM B88 HARD DRAWN
<br />® FD FLOOR DRAIN
<br />FIXTURE BANK OR 18" HIGH AIR CHAMBER FOR EACH PLUMBING
<br />DEOXIDIZED, TYPE M COPPER TUBING WITH ANSI B16.22 WROUGHT
<br />Revisions Date
<br />6.
<br />CONTRACTOR TO SUBMIT CATALOG CUT SHEETS OF ALL THE MATERIAL
<br />FIXTURE. SIZE OF WATER HAMMER ARRESTER SHALL BE SUFFICIENT TO
<br />COPPER WYES AND LONG RADIUS SOLDER-JOINT FITTINGS.
<br />► PR PIPE REDUCER
<br />PROGRESS REVIEW 10-01-2018
<br />AND EQUIPMENT TO BE USED AND WORKING SHOP DRAWINGS FOR
<br />HANDLE THE REQUIRED FIXTURE UNIT AT EACH BANK.
<br />s WCO WALL CLEAN-OUT
<br />APPROVAL BEFORE START OF WORK.
<br />37. NATURAL GAS PIPING AND FITTING:
<br />PERMIT SET 10-29-2018
<br />20.
<br />THE DOMESTIC WATER SUPPLY AND DISTRIBUTION SYSTEM WITHIN THE
<br />FCO FLOOR CLEAN-OUT
<br />7.
<br />SUPPORTS FOR ALL PIPING AND DUCTWORK SHALL BE IN ACCORDANCE
<br />AREA OF WORK SHALL BE STERILIZED WITH CHLORINE IN SOLUTION IN
<br />A. BELOW GRADE PIPING: SCHEDULE 40 STEEL PIPE WITH DRESSERS
<br />BDV STRAINER WITH BLOWDOWN VALVE
<br />WITH LATEST SMACNA "GUIDELINES FOR SEISMIC RESTRAINTS OR
<br />ACCORDANCE WITH AMERICAN WATER WORKS ASSOCIATION PUBLICATION
<br />TYPE AND STEEL WELDING FITTINGS. PRE-WRAP WITH MILL-WRAPPED
<br />MECHANICAL SYSTEMS AND PLUMBING SYSTEMS".
<br />C-601-1954.
<br />CORROSION PROTECTION EXTRUDED POLYOLEFIN COATING IN
<br />101 SMV SEISMIC SHUT-OFF VALVE
<br />ACCORDANCE WITH GAS COMPANY REQUIRMENTS. OR HIGH DENSITY
<br />21.
<br />PRESSURE TEST ENTIRE HOT AND COLD PIPING AND DRAINAGE SYSTEM
<br />POLYETHYLENE PIPING CONFORMING WITH ASTM D 2513, WITH
<br />TMR WATER TEMPERATURE THERMOMETER
<br />Preliminary set
<br />PLUMBING GENERAL NOTES
<br />FROM CAPPED CONNECTIONS, TO AND INCLUDING VENTS.
<br />SOCKET TYPE FITTINGS CONFORMING WITH ASTM D 2683, AND
<br />MINIMUM SDR 11. FOR 6" SIZE OR LARGER NATURAL GAS MAIN,
<br />LINE TYPE ABBREV. DESCRIPTION
<br />Design Review Set
<br />Plan Check Set x
<br />1. PROVIDE ISOLATED COUPLINGS AND/OR UNIONS AT POINTS OF
<br />22•
<br />HOT WATER PIPING TO BE INSULATED PER CODE.
<br />USE BUTT FITTINGS WITH SDR 1 1 . PROVIDE POLYETHYLENE TO SCH.
<br />Plan Check Resubmit
<br />CONNECTION BETWEEN COPPER, STEEL AND BRASS PIPING.
<br />40 STEEL PIPE TRANSITION FITTING AND RISER AT EACH BUILDING
<br />(D) PIPE TO BE REMOVED
<br />23•
<br />PROVIDE ACCESS PANEL FOR ALL STUB OUTS ENDED INSIDE CEILING OR
<br />PRIOR TO EXTENDING GAS PIPING ABOVE GROUND. PROVIDE 16 AWG
<br />Construction Set
<br />2.
<br />ALL WATER PIPING SYSTEMS AND DRAINAGE PIPING SYSTEMS, INCLUDING
<br />WALL.
<br />COPPER TRACE WIRE OVER ENTIRE RUN OF PE PIPING AT 12 INCHES
<br />E EXISTING PIPE TO REMAIN
<br />( )
<br />SUPPLY, WASTE AND DRAIN SHALL BE INSTALLED WITH VIBRATION
<br />ABOVE PIPE.
<br />G G. NATURAL GAS
<br />ISOLATORS AND SHALL BE ISOLATED FROM ANY STRUCTURAL MEMBERS,
<br />24.
<br />THREADED FITTINGS: ANSI/ASME B16.3 BLACK MALLEABLE IRON.
<br />B. FOR ABOVE GRADE PIPING: ASTM A-53, SCHEDULE 40 BLACK STEEL
<br />WALL SECTIONS OR OTHER MATERIALS THAT COULD TRANSMIT SOUND TO
<br />PIPING WITH MALLEABLE IRON THREADED FITTING CONFORMING TO
<br />HWS- HWS HOT WATER SUPPLY
<br />THE OCCUPIED AREAS. ALL HANGERS, STRAPS, BRACKETS, AND SUPPORTS
<br />25.
<br />SOCKET-WELDING FITTINGS: ANSI B16.11 FORGED STEEL.
<br />ANSI B16.3, AND SCHEDULE 40 STEEL FITTING FOR BUTT WELDING
<br />�HWR HWR HOT WATER RETURN
<br />SHALL HAVE ACOUSTICAL COMPONENTS OR COMBINED NEOPRENE AND
<br />CONFORMING TO ASTM A234, OR ASME B16.9
<br />PLASTIC FOAM BY TECH SPECIALTIES, DIVISION OF SPECIALTY PRODUCTS
<br />CW CW COLD WATER SUPPLY
<br />CO. TO ISOLATE COMPLETE PIPE CONTACT AREA. ALL ISOLATION MATERIAL
<br />26.
<br />BUTT-WELDING FITTINGS: ANSI 81 6.9 WROUGHT STEEL WITH
<br />ASME
<br />38 ALL FIXTURES EQUIPMENT PIPING AND MATERIALS SHALL BE LISTED.
<br />SW SW SANITARY WASTE
<br />SHALL HAVE A MINIMUM THICKNESS OF 1/2". INSTALL ALL COMPONENTS
<br />BACKING RINGS OF COMPATIBLEEMATERIAL.
<br />AS PER MANUFACTURER'S INSTRUCTIONS.
<br />27.
<br />UNIONS: ASME/ANSI B16.39 BLACK MALLEABLE IRON.
<br />39. ALL FAUCETS IN PUBLIC RESTROOMS SHALL BE SELF-CLOSING OR
<br />GW GW GREASE WASTE
<br />SELF-CLOSING METERING FAUCETS.
<br />- - V VENT PIPE
<br />3.
<br />INSTALL ALL CLEAN-OUTS WHERE REQUIRED BY ORDINANCES, AT ENDS
<br />OF HOUSE DRAINS, AT ALL CHANGES IN DIRECTIONS, IN ALL STRAIGHT
<br />28.
<br />FLANGES AND FLANGED FITTINGS: ASME/ANSI 816.5 STEEL FLANGES OR
<br />40. PUBLIC LAVATORIES SHALL HAVE CONTROLS TO LIMIT THE WATER
<br />CD CD CONDENSATE DRAIN
<br />RUNS AT 100 FOOT INTERVALS, WHERE HORIZONTAL MAINS CHANGE SIZE,
<br />CONVOLUTED STEEL FLANGES. FLANGE FACES SHALL HAVE INTEGRAL
<br />TEMPERATURE TO 105°F.
<br />AND AT ALL ENDS OF ALL BRANCH PIPES WHICH ARE 5' OR OVER IN
<br />GROOVES OF RECTANGULAR CROSS SECTION WHICH AFFORD
<br />BFP BACK-FLOW PREVENTER
<br />O
<br />LENGTH.
<br />CONTAINMENT FOR SELF-ENERGIZING GASKET MATERIAL.
<br />41. WATER PIPE AND FITTINGS WITH A LEAD CONTENT WITH EXCEEDS 8%
<br />4.
<br />PLUMBING FIXTURES SHALL BE COMPLETED WITH ALL ACCESSORIES
<br />29.
<br />THREADED JOINTS: WHERE POSSIBLE USE PIPE WITH FACTORY-CUT THREADS,
<br />SHALL BE PROHIBITED IN SYSTEMS CONVEYING POTABLE WATER.
<br />ABBR. DESCRIPTION ABBR. DESCRIPTION
<br />REQUIRED FOR A COMPLETE INSTALLATION.
<br />OTHERWISE CUT PIPE LENGTHS ACCORDINGLY WITH ANSI/ASME B1.20.1.
<br />�e
<br />PROVIDE THREADS SMOOTH, CLEAN, AND FULL-CUT. APPLY ANTI-SEIZE PASTE
<br />42. ALL NATURAL GAS COOKING EQUIPMENT SHALL BE EQUIPPED WITH QUICK
<br />AFF ABOVE FINISHED FLOOR FR FROM
<br />5.
<br />SELECTION OF FAUCETS AND FITTINGS SHALL AVOID THE TYPE WITH
<br />OR TAPE TO MALE THREADS PORTION. WORK PIPING INTO PLACE WITHOUT
<br />DISCONNECT GAS HOSE CONNECTION AND RESTRAINING CABLE ATTACHED
<br />V
<br />POTENTIAL FOR LEAD CONTAMINATION.
<br />SPRINGING OR FORCING. BACKING OFF TO PERMIT ALIGNMENT OF THREADED
<br />TO THE EQUIPMENT.
<br />BLDG BUILDING GE GREASE EXHAUST
<br />JOINTS WILL NOT BE PERMITTED. ENGAGE THREADS SO THAT NOT MORE THAN
<br />BSMT BASEMENT
<br />O
<br />DRAWING INDEX
<br />6. INSTALL STOP VALVES ON HOT AND COLD WATER SUPPLIES TO EACH
<br />TWO THREADS REMAIN EXPOSED. USE UNIONS FOR CONNECTIONS TO VALVES,
<br />ICS IN CEILING SPACE
<br />FIXTURE.
<br />METERS FOR WHICH A MEANS OF DISCONNECTION IS NOT OTHERWISE
<br />CFF CAP FOR FUTURE INSINSULATION THERMAL
<br />(THERMAL)
<br />PROVIDED.
<br />PB-0.1 PLUMBING NOTES AND GENERAL INFORMATION
<br />CLG CEILING
<br />7.
<br />ALL FLOOR DRAIN MUST HAVE 1/2" COLD WATER LINE CONNECTED TO
<br />30.
<br />WELDED JOINTS: WELD BY THE SHIELDED METAL-ARC PROCESS, USING
<br />PB-0.2 PLUMBING SCHEDULES, CALCULATION, AND TABLES
<br />CSD CEILING SUPPLY DIFFUSER NIC NOT IN CONTRACT
<br />TRAP PRIMER. ALL UNDERGROUND COLD WATER LINE SHALL BE ASTM
<br />COVERED ELECTRODES AND IN ACCORDANCE WITH PROCEDURES ESTABLISHED
<br />PB-0.3 PLUMBING DETAILS
<br />TYPE-K HARD DRAWN COOPER INSTALLED WITH CONTINUOUS SLOPE
<br />AND QUALIFIED IN ACCORDANCE WITH ASME B31.8.
<br />PB-0.4 PLUMBING DETAILS
<br />EA EXHAUST AIR OSA OUTSIDE AIR (FRESH AIR)
<br />1
<br />TOWARD FLOOR DRAIN.
<br />31.
<br />FLANGED JOINTS: USE FLANGED JOINTS FOR CONNECTING WELDED JOINT PIPE
<br />PB-1.0 GROUND FLOOR DOMESTIC WATER PIPING PLAN
<br />DN DOWN SA SUPPLY AIRI
<br />PB-1.1 GROUND FLOOR WASTE AND VENT PIPING PLAN
<br />8.
<br />MATERIALS, METHODS AND LOCATIONS OF SERVICE MAINS CONNECTING
<br />AND FITTINGS TO VALVES TO PROVIDE FOR DISCONNECTION. INSTALL JOINTS
<br />PB-1.2 GROUND FLOOR GAS PIPING PLAN
<br />SAD SEE ARCHITECTURAL DRAWING
<br />>.
<br />THE NEW CONSTRUCTION TO ALL NEW AND EXISTING SERVICES SHALL BE
<br />SO THAT FLANGE FACES BEAR UNIFORMLY ON GASKETS. ENGAGE BOLTS SO
<br />FA FRESH AIR SOV SHUT-OFF VALVE
<br />IN STRICT ACCORDANCE WITH RULES, REGULATIONS, CODES AND
<br />THAT THERE IF COMPLETE THREADING THROUGH THE NUTS AND TIGHTEN SO
<br />PB-2.0 ROOF PLUMBING PLAN
<br />SRR SIDEWALL RETURN REGISTER
<br />U)REQUIREMENTS
<br />OF ALL AGENCIES HAVING JURISDICTION OVER THIS
<br />THAT BOLTS ARE UNIFORMLY STRESSED AND EQUALLY TORQUE.
<br />FL FLOOR
<br />F--- O�
<br />INSTALLATION. LOCATE ALL EXISTING STUBS TO BE CONNECTED TO IN
<br />FR FROM UTR UP THROUGH ROOF
<br />LU C)
<br />LZLI O�
<br />SCOPE OF WORK
<br />THIS CONTRACT BEFORE WORK IS STARTED. COORDINATE LOCATION OF
<br />32.
<br />USE TEST PRESSURE OF 50 PSIG. DO NOT TEST UNTIL EVERY JOINT HAS SET
<br />CV
<br />WATER AND SEWER CONNECTIONS WITH BUILDING ENGINEER.
<br />AND COOLED AT LEAST 8 HOURS AT TEMPERATURES ABOVE 50 DEGREES F.
<br />VTF VENT THROUGH ROOF
<br />J
<br />0-)
<br />LLJ
<br />TEST PIPING SYSTEM FOR AT LEAST 4 HOURS WITHOUT PRESSURE LOSS OR
<br />0 FURNISH AND INSTALL NATURAL GAS PIPING SYSTEM AND ALL OTHER
<br />O
<br />9.
<br />CAULK AIRTIGHT ALL PLUMBING PENETRATIONS IN SOUND RATED WALLS
<br />VISIBLE LEAKS.
<br />ASSOCIATED COMPONENTS PER PLAN.
<br />O z Q
<br />AND FLOOR/CEILINGS. SEAL PENETRATIONS OF CONCRETE FLOORS WITH
<br />33.
<br />PLUMBING FIXTURE CONNECTION SIZE: SEE PLAN.FURNISH
<br />0 U
<br />-
<br />CEMENT GROUT. MINIMIZE PENETRATIONS THROUGH SOUND RATED
<br />AND INSTALL PLUMBING FIXTURES AND ASSOCIATED COMPONENTS
<br />CONSTRUCTION.
<br />34.
<br />ALL HOT WATER PIPE SHALL BE INSULATED WITH INSULATION PER 2016
<br />PER PLAN.
<br />Q Z
<br />TITLE 24 STANDARD. MINIMUM 1 "-THICK INSULATION FOR PIPE LESS
<br />0 FURNISH AND INSTALL NEW DOMESTIC WATER PIPING SYSTEM WITH ALL
<br />V Z O
<br />10.
<br />CONTRACTOR SHALL INSTALL ALL PLUMBING FIXTURES AND TRIM AS
<br />THAN 1 "0 AND MINIMUM 1Y2"-THICK INSULATION FOR PIPE LARGER THAN
<br />OTHER ASSOCIATED COMPONENTS PER PLAN.
<br />0
<br />�
<br />SHOWN ON THE ARCHITECTURAL PLANS. ROUGH-IN FOR ALL FIXTURES
<br />"0.
<br />Q U
<br />SHALL BE EXACTLY TO MEASUREMENTS FURNISHED BY FIXTURE
<br />OR EQUAL TO 1
<br />0 FURNISH AND INSTALL NEW WASTE, GREASE WASTE, AND VENT SYSTEM
<br />to
<br />W Lo 0
<br />MANUFACTURER. ALL EXPOSED PARTS TO BE CHROMIUM PLATED UNLESS
<br />WITH ALL OTHER ASSOCIATED COMPONENT PER PLAN.
<br />�
<br />SPECIFIED OTHERWISE.
<br />35.
<br />PRESSURE PIPING AND FITTING:
<br />F---
<br />1 1 .
<br />KEEP ROUGH-IN CUTS WITHIN THE PLATE LINES AND DO NOT CUT
<br />A. DOMESTIC COLD AND HOT WATER (ABOVE GRADE): HARD DRAWN
<br />APPLICABLE CODE
<br />COMPLETELY THROUGH PLATES IN SOUND-RATED WALLS. DRILL OR SAW
<br />DEOXIDIZED WATER SERVICE TUBING CONFORMING TO ASTM B88,
<br />NEAT ROUND HOLES FOR ALL PIPING. SIZE APPROXIMATELY Y2 INCH
<br />TYPE "L". PROVIDE 125 PSI FLANGE AT CHANGE OF MATERIAL
<br />2016 CALIFORNIA BUILDING CODE
<br />LARGER THAN THE PIPE DIAMETER.
<br />LOCATIONS.
<br />2016 CALIFORNIA MECHANICAL CODE
<br />Scale: AS NOTED
<br />B. DOMESTIC COLD AND HOT WATER (BELOW GRADE): HARD DRAWN
<br />2016 CALIFORNIA PLUMBING CODE
<br />12.
<br />PIPE LINES SHALL BE INSTALLED FREE FROM TRAPS AND AIR POCKETS
<br />DEOXIDIZED WATER SERVICE TUBING CONFORMING TO ASTM B88,
<br />2016 CALIFORNIA ENERGY CODE
<br />Drawn By: AL
<br />AND TRUE TO LINE AND GRADE WITH SUITABLE SUPPORTS PROPERLY
<br />TYPE TYPE "K".
<br />2016 CALIFORNIA FIRE CODE
<br />Approved By: JP
<br />SPACED. PIPING SHALL BE INSTALLED WITHOUT UNDUE STRESSES AND
<br />C. FITTINGS FOR COPPER WATER TUBING: ANSI B16.22 WROUGHT
<br />2016 CALIFORNIA GREEN BUILDING CODE
<br />WITH PROVISION FOR EXPANSION AND CONTRACTIONS.
<br />COPPER SOLDER-JOINT FITTING.
<br />2016 NEPA 13
<br />Job: 18033
<br />D. TRAP PRIMER PIPING (UNDERGROUND): HARD DRAWN DEOXIDIZED
<br />ALL AMENDMENTS AND SUPPLEMENTS TO ABOVE CODES
<br />13.
<br />HORIZONTAL LINES SHALL HAVE HANGERS OR SUPPORTS SPACED AS
<br />WATER SERVICE TUBING CONFORMING TO ASTM B88, TYPE "K",
<br />ALL CITY OF STOCKTON ORDINANCES AND AMENDMENTS TO ABOVE CODES
<br />Sheet:
<br />FOLLOWS:
<br />WROUGHT COPPER FITTING AND BRAZED JOINT.
<br />PLUMBING NOTES
<br />E. HARRIS, ENGELHARD, OR EQUAL, BCUP FILLER MATERIAL FOR
<br />AND GENERAL
<br />A. CAST IRON PIPE - 5' CENTERS
<br />BRAZING OF COPPER FITTING JOINTS. BRAZE JOINTS FOR COLD
<br />B. STEEL PIPE - 10' CENTERS
<br />WATER PIPING 2-1/2" AND LARGER. BRAZE JOINTS FOR HOT
<br />INFORMATION
<br />C. COOPER TUBING - 5' CENTERS FOR 1-1/2" AND SMALLER, 10'
<br />WATER PIPING 2-1/2" AND LARGER.
<br />of: PB=Oml
<br />CENTERS FOR 2" AND LARGER
<br />
|