Laserfiche WebLink
DUTN <br /> COUNTY OF SAN JOAQUIN THOMAS R. FLINN <br /> 2; .G <br /> DEPARTMENT OF PUBLIC WORKS DEPUTY DIRECTOR <br /> w' P O. BOX 1810- 1810 EAST HAZELTON AVENUE MANUEL LOPEZ <br /> STOCKTON,CALIFORNIA 95201-1810 DEPUTY oiaEcroa <br /> .. P 209/468-3000 STEVEN DIRECTORPUTY <br /> ENWINKLLER <br /> 4 F O R ` FAX:209/468-2999 D <br /> HENRY M. HIRATA <br /> DIRECTOR <br /> July 21, 1998 <br /> MEMORANDUM JUL 21 1998 <br /> TO: Thomas M. Gau, Senior Civil Engineer DolTu1It/ 1OVPlnofelt Jen; <br /> Community Development Department <br /> CONTACT PERSON: Chandler T. Martin <br /> FROM: Richard W. Hieb, Engineering Assistant III <br /> Public Services Division rY <br /> G <br /> SUBJECT: MS-98-23 A MINOR SUBDIVISION APPLICATION TO CREATE TWO LOTS OF <br /> 6,020 AND 5,880 SQUARE FEET DENSITY BONUS REQUESTED, LOCATED ON <br /> THE SOUTHWEST CORNER OF AUGUSTA STREET AND OLIVE STREET IN <br /> WOODBRIDGE. (DISTRICT 4). <br /> APPLICANT: Irvin and Loneita Bender APN: 015-130-04 <br /> INFORMATION: <br /> The site is not currently located within a Federal Flood Insurance Administration Designated Flood Hazard <br /> Area. <br /> Augusta Street has an existing right-of-way width of 60 feet and a planned right-of-way width of 60 feet. <br /> Olive Street has an existing right-of-way width of 60 feet and a planned right-of-way width of 60 feet. <br /> The Traffic Impact Mitigation Fee will be required when parcels are developed. The fee is due and payable at <br /> the time of building permit application. <br /> RECOMMENDATIONS: <br /> 1. A Parcel Map is required. (Development Title Section 9-915.2) <br /> 2. The frontage improvements for Augusta Street and Olive Street shall be constructed in conformance <br /> with the standards for one-half of a 60-foot right-of-way collector residential street conforming to the <br /> Specific Road Plan of the Town of Woodbridge. The construction of the frontage improvements will <br /> be deferred, upon execution by the owner of a Deferred Frontage and Roadway Improvement <br /> Agreement or a Secured Deferred Frontage and Roadway Improvement Agreement with a deposit <br /> equivalent to their estimated construction costs prior to approval of the Parcel Map. (A $260.00 fee <br /> currently is required for processing per Development Title Table 9-240.2 in addition to a copy of the <br /> Grant Deed, legal descriptions of Parcels 1 and 2 and an estimate. The estimate and legal descriptions <br /> shall be prepared by a Registered Civil Engineer with a typical section drawing on a form to be <br /> supplied by the Department of Public Works and submitted to the Department of Public Works for <br /> approval. As an option, the Department of Public Works will prepare the drawing with estimate for an <br /> additional fee of$115.00.) <br /> (Development Title Section 9-1150.2(d)(3)) <br />