My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0012636
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
7870
>
2600 - Land Use Program
>
(QX) EP-81-0009
>
SU0012636
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2019 5:04:28 PM
Creation date
11/14/2019 4:34:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0012636
PE
2605
FACILITY_NAME
(QX) EP-81-0009
STREET_NUMBER
7870
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236-
ENTERED_DATE
11/14/2019 12:00:00 AM
SITE_LOCATION
7870 N WAVERLY RD
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REVISED RECOMMENDATION <br /> STOCKTON SAND AND GRAVEL EIR <br /> (EIR-81-5/EP-81-9) <br /> 9-28•-81_ <br /> - Approve project subject to the following conditions : <br /> 1. This permit shall expire -f-ive LIV,21re years from the date of <br /> approval Aug-ogle--2?o- 986. <br /> 2 . All proposed work excavation and rehabilitation shall be completed <br /> prior to expiration of this permit. Permitted Proposed work shall <br /> not include any testing excavation, project-related storage, or <br /> other activity either in the area located outside project boundaries <br /> as shown on the revised plan map or in the area designated "Area 4 <br /> ( future unknown) " on the revised Excavation and Rehabilitation <br /> Schedule. A revised Schedule shall be filed with the Planning <br /> Department prior to the commencement of excavation to demonstrate <br /> compliance. <br /> 3. Standard Excavation Conditions. The Hours of Operation section <br /> is modified to read : S. _ � <br /> �s <br /> Plant operations shall not be carri d on between the hours <br /> from 5 P .M. through 8 A.M. or on weekends , except during <br /> periods of declared national or state emergency or except <br /> under such other conditions, economic or otherwise, as may <br /> warrant deviation from the above stated restrictions, in which <br /> case operation between 5 P.M. and 8 A.M. and/or on weekends <br /> shall have been approved previously by the Planning Director. <br /> 4. Standard Quarry Excavation Conditions. The Rehabilitation <br /> Schedule section is modified to read : <br /> Cly' ear <br /> Rehabilitation shall be completed not later than z*.. <br /> from the date on which the extraction is completed on any phase, <br /> except that the Director of Planning may, upon request, approve, <br /> as a minor deviation , a one year extension when economic <br /> conditions warrant. <br /> 5 . Revei-sal-®-f-tkeSubaEeas-,4a-and-fib--shall-r-e€ u-iEe <br /> © -ap}� ® a -® - }�e-Paa��rsg-Dieete Excavation operations shall <br /> be set back a minimum of 800 feet eastward from the westerly property <br /> line of the site .. The proposed office, shop, scales, and parking <br /> facilities shall be relocated east of the setback line. <br /> 6. -the <br /> �eea�-F�ea�t -Bstet. Interior truck traffic, excavation , and <br /> processing operations shall not cause the exterior noise level at <br /> the westerly property line © tsce-tke-Sit3¢ge- esdesee to exceed <br /> 65 decibels dBA. §eeeeetr�lat�mrs-e -tie Bsteet;-tetdee <br /> veejetat.ive-bit.fliers.-and-a-greater--pre j•eet-setbaek m om-t:�e- ee dee��e, <br /> eY�a��-3�e-ga�e�ecfed-ae-Let�e��t.�or-o�--tb�s-pe�rpt�t. <br />
The URL can be used to link to this page
Your browser does not support the video tag.