Laserfiche WebLink
October 28, 1981 <br /> M E M O R A N D U M <br /> TO: Al Blevins, Chief Project Inspector <br /> FROM: Malcolm Knisely, Assistant Traffic Engineer�,, � <br /> SUBJECT: Excavation Permit No. 81-9 - Waverly Road <br /> Reference is made to your memorandum of October 16, 1981 relative <br /> to Excavation Permit No. 81-9 - Waverly Road. The traffic division <br /> has checked the sight distance at the existing driveway as requested. <br /> If the driveway is moved 157 ' to the south, the vehicles will have <br /> stopping sight distance of 483' in each direction (approximately 55 mph) . <br /> The traffic division also recommends acel/decel lanes at the driveway <br /> entrance. <br /> The current ADT on Waverly Road S/0 Shelton is 19S (April 1981) . <br /> This count does not appear to warrant left-turn channelization. <br /> MK: rk RECEIVED <br /> OCT 2 8 1981 <br /> SAN JOAQUIN COUNTY <br /> PLANNING DEPARTMENT <br />