My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0012636
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
7870
>
2600 - Land Use Program
>
(QX) EP-81-0009
>
SU0012636
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2019 5:04:28 PM
Creation date
11/14/2019 4:34:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0012636
PE
2605
FACILITY_NAME
(QX) EP-81-0009
STREET_NUMBER
7870
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236-
ENTERED_DATE
11/14/2019 12:00:00 AM
SITE_LOCATION
7870 N WAVERLY RD
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• CONDITIONS OF APPROVAL <br /> MODIFICATION OF EXCAVATION PERMIT NO. EP-81-9 OF <br /> ROSS PURVIANCE (C/O STOCKTON SAND & GRAVEL, INC.) <br /> Modification of Excavation Permit No. EP-81-9 was approved by the <br /> Planning Commission on January 17, 1985, subject to the conditions <br /> of approval adopted on May 6, 1982, with the modifications or <br /> additions of Condition #s 1 , 2, 3 ,4, 7,9 and 24 underlined as follows: <br /> 1 . This permit shall expire no later than fifeeen years from the <br /> date of conditional approval . <br /> 2 . All proposed excavation and rehabilitation shall be completed <br /> prior to expiration of this permit in accordance with the <br /> revised Excavation and Rehabilitation Schedule submitted as <br /> part of the proposed modification. (Dated December 11 , 1984) <br /> 3 . Standard Excavation Conditions : The Hours of Operation sec- <br /> tion is modified to read: Excavation of approved areas <br /> within the 1320 ' setback line shown on the site plan shall be <br /> beween the hours of 8 : 00 a. m. to 5 : 00 p. m. , Monday through <br /> Friday. Excavation and processing of excavate materia s <br /> outside the 1320 ' setback line shown on the site plan—may be <br /> conducted between 5 : 00 a.m. and 9 : 00 p.m. , Monday through <br /> Saturday. <br /> 4 . The existing uncompleted processing structure shall be preci- <br /> sely located on a revised site plan, and a o er processing <br /> equipment shall e located east o Te 13=_ s�'ack—Tine-`_ <br /> shown on the site plan. - <br /> 5 . All stockpiling of soil , sand, gravel , or rock and the <br /> storage of salvageable or usable equipment or material shall <br /> be not less than 1 , 320 feet easterly of the westerly property <br /> line . No such salvageable or usable equipment or material <br /> shall be visible from the westerly property line or Waverly <br /> Road. All equipment and material which is not salvageable or <br /> usable shall be removed from the premises . <br /> 6 . Interior truck traffic , excavation, and processing operations <br /> shall not cause the exterior noise level at the westerly pro- <br /> perty line to exceed 65 decibels dBA. <br /> 7 . Standard Quarry Excavation Development Requirements per <br /> Secfion-9=2244 of ffie Planning Title s a apply- <br /> _ . No sand or loam or other materials to be used to implement <br /> rehabilitation is to leave the project site. <br /> 9. _Standard Quarry Excavation Development ion <br /> (-u , Guarantee of Performance, s <br /> within 60 days. op%r 15� <br /> FEB 26 185 <br /> ENVIRUMENTAL HEALTH <br /> PERMIT/SERVICES <br />
The URL can be used to link to this page
Your browser does not support the video tag.