Laserfiche WebLink
No sand or loam or other materials to be used to implement <br /> rehabilitation are to leave the project site . <br /> Condition No . 9 : <br /> The applicant shall comply with Standard Quarry Excavation <br /> Development Requirement Section 9-2244 (u) , Guarantee of <br /> Performance , prior to May 21 , 1988 . <br /> Condition No . 10 : <br /> The applicant shall maintain valid dust and particulate <br /> emission control permits issued by the Air Pollution Control <br /> District . The applicant shall maintain a water truck on-site <br /> and shall apply sprinkling to unimproves surfaces as necessary <br /> to control dust generation. <br /> Condition No . 11 : <br /> The applicant shall maintain a fire truck on-site . The con- <br /> dition of the fire truck shall be certified as adequate by the <br /> Linden-Peters Rural Fire District . A copy of the certification <br /> letter shall be submitted for approval by the Fire Warden. <br /> Condition No . 12 : <br /> The applicant shall consult the Soil Conservation Service or <br /> the Agricultural Extension Service for reseeding recommen- <br /> dations and shall adopt these recommendations as part of the <br /> rehabilitation plan. A copy of the reseeding plan shall be <br /> submitted for review and approval by the Planning Division <br /> prior to the commencement of excavation. <br /> Condition No . 13 : <br /> Dikes shall be constructed around areas under excavation. <br /> Water shall be directed by pipe or ditch to and from settling <br /> ponds . Construction of dikes shall be subject to approval by <br /> the Department of Public Works and the State Water Quality <br /> Control Board and shall be designed to prevent erosion, silta- <br /> tion, and water runoff from the site . <br /> Condition No . 14 : <br /> Herbicides shall be used for weed control in ponds. Water in <br /> ponds shall be maintained at a minimum depth of three feet . <br /> The applicant shall consult the Mosquito Abatement District and <br /> adopt its recommendations for vector control . <br /> Condition No. 15 : <br /> The applicant shall submit an approved reclamation plan to the <br /> California Department of Conservation prior to commencement of <br /> excavation. <br /> Revised Conditions - 2 - (EP-81-9 ) <br />