Laserfiche WebLink
PEA <br /> Quarry Excavation <br /> Page Five <br /> REHABILITATION (Continued) <br /> State the type of material used to cover the excavation final <br /> surface and the type of material used to refill any refilled <br /> portion: <br /> Stored Overburden <br /> Describe the methods used to control erosion on slopes greater <br /> than 10 :1: <br /> Dykes -see plans previously submitted and approved. <br /> Who will be responsible to maintain rehabilitated areas : <br /> No maintenance after re-establishment of native grasses. <br /> Describe the means of eliminating safety hazards and disposing <br /> of equipment at the end of operations (shafts, slopes, etc. ) : <br /> No permanent structures or equipment will remain at the end of <br /> operation. <br /> I declare under penalty of perjury the foregoing is true to the best <br /> of my knowledge and belief. <br /> DATE: September 1984 SIGNED: <br /> NAME: Don Merian <br /> 7TOCKTONS D GRAVEL, INC. <br /> ADDRESS : P.O. Box 127 <br /> Linden, California 95236 <br /> PHONE NO .209 948-6460 <br /> (9/83) <br />