Laserfiche WebLink
MONIT(OING SYSTEM CERTIF 'ATION <br /> CERTIFICATION / TEST DATE: October 25, 2011 <br /> Al. FACILITY A2. OWNER <br /> Name BP#29 Cruisers Manteca Name Boyett Petroleum <br /> Address 1137 W. Lathrop Road, Manteca,CA 95336 Address 601 McHenry Avenue, Modesto, CA 95350 <br /> Phone# 209-824-2760 Phone# 209-577-6000 <br /> Contact Rohda Henry Contact Rohda Henry <br /> F. IN-TANK GAUGING / SIR EQUIPMENT: = Check this box if tank gauging is used only for inventory control. <br /> Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gaugung equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> ■ Yes ❑ No* Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> ■ Yes ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ■ Yes ❑ No* Was accuracy of system product level readings tested? <br /> ■ Yes ❑ No* Was accuracy of system water level readings tested? <br /> ■ Yes ❑ No' Were all probes reinstalled properly? <br /> ■ Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> In Section H below, describe how and when these deficiencies were or will be corrected. <br /> G. LINE LEAK DETECTORS (LLD): = Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> ■ Yes ❑ No* For equipment start-up or annual equipment certification,was a leak simulated to verify LLD performance? <br /> ❑ N/A (check all that apply) Simulated leak rate: ■ 3 g.p.h.; ❑ 0.1 g.p.h.; ❑ 0.2 g.p.h. <br /> ■ Yes ❑ No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> ■ Yes ❑ No* Was the testing apparatus properly calibrated? <br /> ❑ Yes ❑ No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ■ N/A <br /> ■ Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> ❑ NIA <br /> ■ Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> ❑ N/A or disconnected? <br /> ■ Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions <br /> ❑ N/A or fails a test? <br /> ■ Yes ❑ No* For electronic LLDs, have all accessible wiring connections been visually inspected? <br /> ❑ N/A <br /> ■ Yes ❑ No* Were all items on the equipment manufacturers maintenance checklist completed? <br /> * In Section H below, describe how and when these deficiencies were or will be corrected. <br /> H. COMMENTS <br /> 2011 Walton Engineering,Inc. <br /> Page 3 of 3 <br />