My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012658
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEBER
>
1320
>
3500 - Local Oversight Program
>
PR0545006
>
ARCHIVED REPORTS_XR0012658
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2019 4:32:19 PM
Creation date
12/3/2019 3:40:45 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012658
RECORD_ID
PR0545006
PE
3528
FACILITY_ID
FA0009753
FACILITY_NAME
STOCKTON COLD STORAGE
STREET_NUMBER
1320
Direction
W
STREET_NAME
WEBER
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
APN
14519013
CURRENT_STATUS
02
SITE_LOCATION
1320 W WEBER AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
428
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�.a <br /> t <br /> Wl,tF Environmental consultants, Inc. <br /> Health do Safety Plan <br /> Page: 3 <br /> Should for any reason, conditions change, the site will be elevated to an <br /> appropriate level of entry for safe working, based on the Project Safety Officer <br /> (PSO) and Project Manager (PM). <br /> Should at any time the level of entry change, the remaining specific safety <br /> equipment and precautions can be implemented by the manager as required. <br /> This is fully defined in the following sections. <br /> 2.0 SAFETY IMPLEMENTATION <br /> The provisions of the WHF Environmental consultants, Inc. Health and Safety Plan <br /> are mandatory for all personnel associated with the site project and operations. <br /> A complete background review and site visitation will be conducted in order to <br /> determine whether specific amendments are to be made to the Health and Safety Plan <br /> based on specific characteristics which may exist on the job site. Any suspected <br /> hazards associated with the on-site operation which exposure to, via inhalation or skin <br /> absorption, to such as suspected carcinogens or human sterilants, will be documented <br /> and specific guidance will be developed and added to this Health and Safety Plan as <br /> Appendices. <br /> A defined project site layout is paramount to the safe completion of all remedial site <br /> investigations. The project site layout has built-in safety features. The site is divided <br /> into three zones. The following list defines the required personnel protective <br /> equipment. <br /> 2.1 Personnel Protective Equipment (PPE) <br /> Personnel who will be working in or around the exclusion zone of the job site <br /> will use the following protective equipment and measures as warrant by the <br /> Project Manager: <br /> - Coveralls as an undergarment <br /> - Saranex outer garment <br /> - Sample gloves(inner) <br /> - PVC, Nitrile or Neoprene outer gloves <br /> - - - - -- -- Hard bat-- <br />
The URL can be used to link to this page
Your browser does not support the video tag.