Laserfiche WebLink
E. The construction , fabrication , and manufacture of any equipment or <br /> materials specified herein mayhave efreepaccessbtotmakeusuchhe ONERainspection. or <br /> factory and the OWNER shall <br /> C. Certified copies of all test reports available to the CONTRACTOR shall be I; <br /> furnished to the OWNER. I <br /> ARTICLE 21 - CORRECTION OF WORK PEFORE FINAL ACCEPTANCE <br /> If the OWNER s <br /> ha11 condemn any Work , or part thereof , as failing to conform to k <br /> the Contract , he shall promptly notify the CONTRACTOR of such failure in the <br /> farn, of a punch list which shall include items to be comp}-eted in accordance <br /> with the drawings , specifications , and acceptedeonstruoriremedyC(whichevere <br /> on p <br /> CONTRACTOR shall , upon receipt of such notice , replace <br /> the OWNER shall require) the condemned C�ORrshall°bearnaalpart <br /> expensese incidents <br /> to conform to the Contract. The COT <br /> to such replacement or remedial Work including cost of transportati oti orsmi gal <br /> of Work , and installation of the replacement, repairs to, <br /> and the Work of other contractors necessitated by the aforesaid replacement or <br /> itions of <br /> remedial Work. Should the CONTRACTOR be unable to ful fi 1.1 the condremove the <br /> ' the Contract by replacing or remedying <br /> forthe al lWmoneyhpai dall thereonpand the <br /> entire Work and reimburse <br /> transportation and installation costs thereof. <br /> ARTICLE 22 - CORRECTION OF WORK AFTER FINAL ACCEPTANCE <br /> Neither final acceptance nor final payment by the OWNER, nor any provision of <br /> . the Contract , shall relieve the CONTRACTOR of responsibility <br /> yator sdefective <br /> materials or faulty workmanship. He shall promptly { <br /> hich shall appear within a period of one year from the <br /> expense , any defects w <br /> date of final acceptance of the canpleseminsbbel requirednbyatheWork under the <br /> Contract , or within such longer term a may i <br /> specifications. The entire entsnof thisnA�rcle , shall <br /> remedialcorrect <br /> be borne ebyothe i <br /> performed under the requirement <br /> CONTRACTOR and his Subcontractors as theirinterest <br /> shalls in �bendeemedoto includes <br /> for, the defective Work may ppeexpense 1 adement of defective <br /> the costs of transportation incident to the repair or rep Work or <br /> well <br /> Mork , removal and reinstallation thereof ,ifically attrias butable�toothe eremedial I <br /> property of others resulting from op <br /> or corrective cork , undertaken e�Yedadefectsthe <br /> withContract. <br /> reasonablepOroa'�ptness�l give 1 <br /> notice to the CONTRACTOR of obs <br /> ARTICLE 23 - CHANGES OR ADDITIONS .TO.THEE_WORK <br /> A. The OWNER , without invalidating the Contract, may order additional work or � <br /> make changes by altering , adding to, or deducting from the Work. No <br /> f <br /> change , addition , or deletion wrhttenbauthorization uthorized uofess theShown on OWNER. revised <br /> drawings or covered by prior } <br /> f <br /> • I <br /> 1 . <br /> Issue D <br /> GCL-13- <br />