Laserfiche WebLink
Wm. J. Hunter & Associates �..+� . 2220 Loma Vista Dr. <br /> Registered Geologists j i Sacramento, CA,95825 <br /> Petroleum& Mineral Appraisers (916)972-7943 <br /> � FAX (916) 972-16433 <br /> SEA 1 1,994 <br /> September 15, 1.994 <br /> ENViRONMFNTA!_HEALTH <br /> Steve Sasson,- Sr.. REHS PERMIT/SERVICES <br /> San Joaquin County 'PEiS . <br /> Environmental Healtb. Division <br /> 445 No. San Joaquin Street <br /> Stockton, CA 9520.2 <br /> .Ref : Valley Showcase, 91.3 W. Fremont St. ; Site Code 1114 <br /> i <br /> wear Steve; <br /> In response to correspondence ,from your off.ice -.dated 8/9/1994 , i <br /> concerning the next .scope of work at the site, we have met with <br /> our client and are planning the following activities, with � <br /> suggested time .schedules As shown. <br /> I - Reexcavation of the site which contained the UST, removing as � <br /> much additional -'contamination as possible, taking appropriate ; <br /> soil samples, and,"backf illing, the excavation with clean material_ <br /> This will enable 'tYie` own6k to lease the property, which is <br /> currently vacant. ' Our timetable for this work is tentatively <br /> scheduled as follows: <br /> a ) Obtain bids : fr_om qualified excavation contractors - .9%30. <br /> b) Preparation & submittal of workplan - '10/7 . <br /> c) Work tocommence as soon as County approval- received. <br /> 2. Place one (1 ) 2" diameter groundwater monitoring well in a <br /> downgradient position from existing well #2.. St is planned to <br /> locate it in ,the s.idewal.k .northwest of #2; the existing City <br /> encroachment & revocable permits are be to' still be valid. <br /> Our estimated timetable for this phase of the work is as follows <br /> a) Obtain" bids from "quali'fitrd drilling c•o it-r�actors�' ;10/7 . <br /> b) Preparation & submittal- of. workplari & drilling permit applica.- <br /> f" tion to County - 14/14. <br /> c) After receiving County approval, work will- be scheduled as <br /> soon as rig availability permits. <br /> We are preparing .RFP' s for bath, ;stages of the project, and will <br /> keep you informed of final dates for starting work_ If you have <br /> any questions, please give a call. . <br /> SinaPo <br /> y, <br /> Wm. ' nt:or &' Assrsci:atos <br /> cc: ae "I;echich. ; <br /> Mike Cra-ffin ' <br /> 3 <br />