My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0006545
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WILLIAMS
>
19523
>
2600 - Land Use Program
>
PA-0700113
>
SU0006545
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2019 3:05:44 PM
Creation date
12/18/2019 2:46:50 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0006545
PE
2606
FACILITY_NAME
PA-0700113
STREET_NUMBER
19523
Direction
S
STREET_NAME
WILLIAMS
STREET_TYPE
WY
City
RIPON
APN
24513038
ENTERED_DATE
4/30/2007 12:00:00 AM
SITE_LOCATION
19523 S WILLIAMS WY
RECEIVED_DATE
4/30/2007 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(4) Have an average elevation of the natural of no less than the average elevation of the natural <br />grade of the surrounding land. The average elevation of the natural or existing grade shall be the <br />average elevation of all land 100 feet from the perimeter of the proposed excavation, excluding <br />any portion of the perimeter adjacent to a river, river -bank, levee, public road, railroad, canal, <br />pipeline, or other similar uses or rights-of-way. <br />f. EROSION CONTROL: Protective vegetative planting, silt screen dams, or other approved methods <br />shall be required where necessary for the control of erosion. An erosion and sediment control plan <br />approved by Development Services Division shall be part of the reclamation plan. (Development Title <br />Section 9-1410.3[m]) <br />g. HOURS OF OPERATION: Excavation operations shall not be carried on during the hours from 9:00 <br />p.m. and 5:00 a.m. (Development Title Section 9-1410.3(d)). <br />h. LIGHTING: Any night lighting established on the property shall be arranged and controlled so as not <br />to illuminate public right-of-way or adjacent properties. (Development Title Section 9-1410.3(e) <br />i. EMISSIONS: All emissions shall be subject to the rules and regulations of the San Joaquin Valley Air <br />Pollution Control District. (Development Title Section 9-1410.3 (f) <br />j. WEED CONTROL: If noxious weeds are on the site, operations shall be in accordance with <br />instructions from the Agricultural Commissioner of San Joaquin County. (Development Title Section <br />9-1410.3[h]) <br />k. HEALTH CONSIDERATIONS: Excavations shall not cause health or sanitary hazards and shall not <br />create conditions which will cause the breeding or increase of mosquito's, rodents, or other pests. <br />(Development Title Section 9-1410.3(i) <br />I. COMMENCEMENT OF WORK: A written notification of work schedules shall be provided to the <br />County by the applicant prior to initiating any grading or excavation. (Development Title Section <br />9-1410,30) <br />m. CERTIFICATION OF COMPLIANCE: At the completion of the grading, the applicant shall have a <br />registered civil engineer or licensed surveyor compare the excavation's final elevations with the <br />approved permit. The engineer or surveyor shall submit a certified, written finding to the Building <br />Official which states and documents the compliance or noncompliance of the excavation with the <br />approved permit. (Development Title Section 9-1410.3(k) <br />n. EXCAVATION/RECLAMATION SCHEDULE: The reclamation plan shall show the phases of <br />excavation. Reclamation on one phase of an excavation shall be initiated prior to the start of the next <br />excavation phase. The final reclamation of any phase of excavation shall be completed within two <br />years of the commencement of the reclamation process. Excavation shall be limited so that at any <br />point of time a maximum of one phase is being reclaimed while one phase is being excavated. <br />(Development Title Section 9-1410.3[n]) <br />o. TIME LIMITATION: The Agricultural Excavation Permit shall expire 3 years from the date of <br />approval as indicated on the reclamation plan dated March 11, 2007. <br />p. ANNUAL INSPECTION REPORTS: Annual inspections of the excavation shall be conducted by the <br />County to ensure compliance with the conditions of the permit and the reclamation plan. The County <br />may use professional services as provided for in Section 9-240.11. The consultant shall be selected <br />by San Joaquin County. Upon completion of the annual inspection, the person in charge of the <br />mining operation shall submit to the State Geologist and the County a report which shall contain all <br />the information as required by Section 2207 of the Public Resources Code. The cost of the <br />Conditions of Approval - 2 - PA -0700113 <br />
The URL can be used to link to this page
Your browser does not support the video tag.