Laserfiche WebLink
• All personnel who conduct work in Level C PP_E must be clean-shaven to <br /> eliminate the possibility'of improper respirator fit <br /> i <br /> During all Level C activities or when particular conditions present a substantial risk toP ersonnel <br /> (both physical and chemical),the buddy system will be implemented. A buddy system requires <br /> that two or three people work as a team; each looking out for each other. Buddies must maintain <br /> t <br /> continuous line-of-site contact with onel another and be in a position to physically assist should <br /> rescue be necessary. { <br /> 5.2 Reassessment of Personal Protection Program <br /> The Level of Protection provided by PPE selection shall be upgraded or downgraded based upon <br /> action limits from instrument readings, a change in site conditions, or findings from <br /> investigations. <br /> i <br /> When a significant change occurs, the hazards shall be reassessed. Some indicators of the need <br /> for reassessment are: I � <br /> R <br /> Change in job tasks during a work phase <br /> • Change of season/weather k <br /> Contaminants other than those previously identified are being handled <br /> j • Change in work scope that affects the degree of contact with contaminants <br /> j • When two separate tasks are being conducted simultaneously (e.g., one <br /> non-intrusive and one intrusive), the higher level of protection will be used <br /> If the Level of Protection is to be downgraded,then personnel will continue work in the original f <br /> Level of Protection until IT or Contractor HSO approves. If tlxe Level of Protection is to be <br /> upgraded, the personnel will leave the affected area and don the higher level of protection. <br /> LChanges will be noted in the HASP and rationale provided. <br /> 5.3 Engineering Controls <br /> Ll � <br />! Whenever possible, before increasing the level of PPE required, engineering controls will be <br /> utilized to minimize hazards at the Site. Examples of engineering controls include using a water <br /> spray to suppress dust, or use of fans to increase ventilation. <br /> . cDPN:IConsidtingldataLVwre"rojectsWJ7177840Zaa.doc 5_� <br /> ' 1217100 <br /> k <br />