Laserfiche WebLink
INTERIM CORRECTIVE ACTIONS <br /> • 330 cubic yards of petroleum-impacted soil from the former UST excavation area excavated by IT in May 1995. <br /> • Excavation backfilled with clean imported fill material and capped. <br /> • Horizontal vapor observation point installed at the base of the excavation by IT in May 1995. <br /> 1 <br /> MZJ 11-09-95/VDB F/95-0040.LF <br />