My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
12 (STATE ROUTE 12)
>
5400
>
2800 - Aboveground Petroleum Storage Program
>
PR0545140
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 3:46:02 PM
Creation date
1/10/2020 9:28:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0545140
PE
2832
FACILITY_ID
FA0025200
FACILITY_NAME
CECCHINI TRUCKING CO INC, CTC CFC
STREET_NUMBER
5400
Direction
W
STREET_NAME
STATE ROUTE 12
City
LODI
Zip
95242
APN
05516072
CURRENT_STATUS
01
SITE_LOCATION
5400 W HWY 12
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cecchini Trucking Company Inc. <br />SPCC Plan <br />April 2020 <br />Page 31 of 63 <br />• The facility is routinely patrolled by employees during hours of operation. <br />• The diesel fueling area is equipped with automated area lighting. The shop building <br />has overhead lighting. There is ample light to be able to detect a spill after dark. <br />6.2 Protection from Vehicles <br />The large diesel tank and fuel dispensing equipment are protected from vehicles and <br />equipment by K -Rails which will be installed to protect the tanks. <br />7.0 Training, Inspections, Tests, Reviews and Records <br />7.1 Personnel Training <br />Annually, the Designated Person trains all employees who dispense fuel, transfer lubricants, <br />and oversee the filling of fuel tanks. Any new person is also trained before they first perform <br />that function. A sample training log is included in Appendix B. The following topics are <br />addressed in the training: <br />• Proper procedures for performing the activity; <br />• Safety and fire prevention considerations; <br />• The location of the emergency shut off switches; <br />• The location, contents, and use of the spill clean-up kits; <br />• The location and contents of the SPCC Plan; <br />• Spill notification procedures and responsibilities; and <br />• Documentation requirements. <br />7.2 Bulk Storage Inspections and Integrity Testing <br />7.2.1 STI SP001 AST Inspection Standard <br />Cecchini Trucking performs monthly, and annual inspections based upon the STI SP001 <br />which is the industry standard for the type of tanks installed at the facility. The STI SP001 <br />Inspection Checklist is used during each inspection; refer to Appendix C in this SPCC Plan. <br />Monthly and annual inspections include the following: <br />• Visual inspection of all tank surfaces and bases for signs of leaks, corrosion, <br />deterioration, or other structural problems; <br />
The URL can be used to link to this page
Your browser does not support the video tag.